If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364202016020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.114369,"lon":-112.813824,"icon":""}]} |
Location: 02/16-20-036-20W4/0 | |
Location Alias: 02/16-20-36-20 W4M | |
Location Alias 2: 02/16-20-036-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 20 | |
Section: 20 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: BEARSPAW 102 FENNW 16-20-36-20 | |
Operator Name: Bearspaw Petroleum Ltd. | |
License Number: 0433789 | |
License Date: 2011-05-26 | |
License Status: Issued | |
Spud Date: 2011-11-05 | |
Final Drill Date: 2011-11-09 | |
Well Total Depth: 895.00 m | |
Surface Hole Latitude: 52.114369 | |
Surface Hole Longitude: -112.813824 |
Date | Event |
---|---|
2011-05-26 | Obtained License |
2011-11-05 | Direction Drilling Operation Performed - Deviate |
2011-11-07 | Surface Casing Operation Performed |
2011-11-09 | Finished Drilling |
2011-11-09 | Production Casing Operation Performed |
2011-11-09 | Rig Released |
2011-11-09 | Well Mode changed to Drilled and Cased |
2011-11-16 | Well Log Performed |
2012-05-10 | Perforation Treatment Performed - Jet Perforation |
2013-10-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-02-01 | Well Began Production |
2014-02-01 | Well Fluid changed to Coalbed Methane-Coals Only |
2014-02-01 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-05 | 12.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-05-10 | Perforation | 456.00 | 457.50 | 13 |
2012-05-10 | Perforation | 342.00 | 344.50 | 13 |
2012-05-10 | Perforation | 334.00 | 336.50 | 13 |
2012-05-10 | Perforation | 329.20 | 330.70 | 13 |
2012-05-10 | Perforation | 321.00 | 324.00 | 13 |
2013-10-07 | Multi-Stage Fracture | 456.00 | 457.50 | 0 |
2013-10-07 | Multi-Stage Fracture | 448.50 | 450.50 | 0 |
2013-10-07 | Multi-Stage Fracture | 434.50 | 436.50 | 0 |
2013-10-07 | Multi-Stage Fracture | 395.00 | 397.00 | 0 |
2013-10-07 | Multi-Stage Fracture | 389.70 | 391.70 | 0 |
2013-10-07 | Multi-Stage Fracture | 382.50 | 383.50 | 0 |
2012-05-10 | Perforation | 448.50 | 450.50 | 13 |
2013-10-07 | Multi-Stage Fracture | 369.50 | 373.50 | 0 |
2013-10-07 | Multi-Stage Fracture | 360.00 | 361.00 | 0 |
2013-10-07 | Multi-Stage Fracture | 352.50 | 357.50 | 0 |
2013-10-07 | Multi-Stage Fracture | 342.00 | 344.50 | 0 |
2013-10-07 | Multi-Stage Fracture | 334.00 | 336.50 | 0 |
2013-10-07 | Multi-Stage Fracture | 329.20 | 330.70 | 0 |
2013-10-07 | Multi-Stage Fracture | 321.00 | 324.00 | 0 |
2012-05-10 | Perforation | 434.50 | 436.50 | 13 |
2012-05-10 | Perforation | 395.00 | 397.00 | 13 |
2012-05-10 | Perforation | 389.70 | 391.70 | 13 |
2012-05-10 | Perforation | 382.50 | 383.50 | 13 |
2012-05-10 | Perforation | 369.50 | 373.50 | 13 |
2012-05-10 | Perforation | 360.00 | 361.00 | 13 |
2012-05-10 | Perforation | 352.50 | 357.50 | 13 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-07 | 2013-10-07 | 736 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 7520 | 0.0 | 0.0 | 0.0 |
2015 | 8679 | 0.0 | 0.0 | 0.0 |
2016 | 8375 | 0.0 | 0.0 | 0.0 |
2017 | 6687 | 0.0 | 0.0 | 0.0 |
2018 | 4981 | 0.0 | 0.0 | 0.0 |
2019 | 5623 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-05-10 | No Incident Encountered | 0.00 | 0.00 |
2013-10-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]