X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364202301000

Well Details

Well ID: 0364202301000
Loading map...
Location: 00/01-23-036-20W4/0
Location Alias: 00/01-23-36-20 W4M
Location Alias 2: 00/01-23-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 23
County/Municipality: County of Stettler No. 6
Well Name: CPR GOUGH NO. 1
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0005361
License Date: 1952-09-25
License Status: RecCertified
Spud Date: 1952-09-27
Final Drill Date: 1952-10-17
Well Total Depth: 1600.50 m
Surface Hole Latitude: 52.101070
Surface Hole Longitude: -112.746181

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-09-25 Obtained License
1952-10-17 Drill Stem Test Performed
1952-10-17 Finished Drilling
1952-10-17 Production Casing Operation Performed
1952-10-17 Well Mode changed to Drilled and Cased
1952-10-21 Perforation Treatment Performed - Open-Hole Completion
1952-10-23 Well Began Production
1952-10-23 Well Fluid changed to Crude Oil
1952-10-23 Well Mode changed to Flowing
1978-07-07 Perforation Treatment Performed - Cement Plug
1978-07-08 Perforation Treatment Performed - Cement Plug
1978-07-08 Perforation Treatment Performed - Open-Hole Completion
1982-05-13 Perforation Treatment Performed - Cement Plug
1982-05-13 Perforation Treatment Performed - Open-Hole Completion
1982-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-18 Perforation Treatment Performed - Cement Squeeze
1984-02-21 Well Log Performed
1984-02-22 Perforation Treatment Performed - Jet Perforation
1984-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-29 Perforation Treatment Performed - Cement Squeeze
1984-03-29 Well Log Performed
1984-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-31 Perforation Treatment Performed - Jet Perforation
1985-05-01 Well Fluid changed to Crude Oil
1985-05-01 Well Mode changed to Suspended
1986-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-01-15 Plug Back Performed
1986-01-15 Well Fluid changed to Crude Oil
1986-01-15 Well Mode changed to Abandoned Zone
1986-01-16 Perforation Treatment Performed - Jet Perforation
1986-01-17 Perforation Treatment Performed - Jet Perforation
1986-01-17 Perforation Treatment Performed - Remedial Casing
1986-01-18 Perforation Treatment Performed - Jet Perforation
1986-01-21 Perforation Treatment Performed - Remedial Casing
1986-01-23 Perforation Treatment Performed - Jet Perforation
1991-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-07-26 Perforation Treatment Performed - Jet Perforation
1991-07-26 Plug Back Performed
1991-07-27 Perforation Treatment Performed - Remedial Casing
1991-08-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-10-21 Open Hole/Barefoot Completion 1575.80 1600.50 0
1984-02-23 Acid Treatment 1575.80 1578.20 0
1984-03-29 Acid Treatment 1575.80 1578.20 0
1984-03-29 Cement Squeeze 1575.80 1578.20 0
1984-03-31 Perforation 1575.80 1578.20 13
1984-03-31 Acid Treatment 1575.80 1578.20 0
1986-01-15 Packing Device Capped w/Cement 1560.40 1571.00 0
1986-01-16 Perforation 662.70 663.00 13
1986-01-16 Perforation 572.00 572.30 13
1986-01-17 Perforation 632.50 633.00 13
1986-01-17 Remedial Casing Cementing 632.50 663.00 0
1978-07-07 Cement Plug 1590.00 1600.50 0
1986-01-18 Perforation 620.00 620.50 13
1986-01-18 Perforation 600.00 600.50 13
1986-01-21 Remedial Casing Cementing 572.00 620.50 0
1986-01-23 Perforation 606.50 612.60 13
1991-07-26 Packing Device Capped w/Cement 587.00 595.00 0
1991-07-26 Perforation 208.90 209.40 13
1991-07-27 Remedial Casing Cementing 208.90 209.40 0
1978-07-08 Cement Plug 1584.70 1600.50 0
1978-07-08 Open Hole/Barefoot Completion 1575.80 1584.70 0
1982-05-13 Cement Plug 1580.60 1584.70 0
1982-05-13 Open Hole/Barefoot Completion 1575.80 1580.60 0
1982-05-18 Acid Treatment 1575.80 1580.60 0
1984-02-18 Cement Squeeze 1575.80 1580.60 0
1984-02-22 Perforation 1575.80 1578.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 5157 0.0 0.0 0.0
1973 7389 0.0 0.0 0.0
1974 6884 0.0 0.0 0.0
1975 5638 0.0 0.0 0.0
1976 4814 0.0 0.0 0.0
1977 5248 0.0 0.0 0.0
1978 5220 0.0 0.0 0.0
1979 7002 0.0 0.0 0.0
1980 6417 0.0 0.0 0.0
1981 7187 0.0 0.0 0.0
1982 5333 0.0 0.0 0.0
1983 8057 0.0 0.0 0.0
1984 1938 0.0 0.0 0.0
1985 720 0.0 0.0 0.0

For data sources see[5]

References