X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364202303000

Well Details

Well ID: 0364202303000
Loading map...
Location: 00/03-23-036-20W4/0
Location Alias: 00/03-23-36-20 W4M
Location Alias 2: 00/03-23-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 23
County/Municipality: County of Stettler No. 6
Well Name: CPR GOUGH NO.3
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0005793
License Date: 1952-12-13
License Status: Abandoned
Spud Date: 1952-12-19
Final Drill Date: 1953-01-11
Well Total Depth: 1601.10 m
Surface Hole Latitude: 52.101340
Surface Hole Longitude: -112.757521

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-13 Obtained License
1953-01-11 Finished Drilling
1953-01-11 Well Mode changed to Drilled and Cased
1953-01-12 Perforation Treatment Performed - Open-Hole Completion
1953-01-12 Production Casing Operation Performed
1953-01-20 Well Began Production
1953-01-20 Well Fluid changed to Crude Oil
1953-01-20 Well Mode changed to Flowing
1975-11-22 Perforation Treatment Performed - Cement Plug
1975-11-22 Perforation Treatment Performed - Open-Hole Completion
1978-06-27 Perforation Treatment Performed - Cement Plug
1978-06-27 Perforation Treatment Performed - Jet Perforation
1978-06-28 Perforation Treatment Performed - Cement Plug
1978-06-28 Perforation Treatment Performed - Open-Hole Completion
1983-09-29 Perforation Treatment Performed - Cement Plug
1983-09-29 Perforation Treatment Performed - Open-Hole Completion
1983-09-30 Well Log Performed
1983-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-01 Perforation Treatment Performed - Jet Perforation
1985-02-23 Perforation Treatment Performed - Open-Hole Completion
1985-02-27 Well Log Performed
1985-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-28 Perforation Treatment Performed - Cement Plug
1985-02-28 Perforation Treatment Performed - Cement Squeeze
1985-02-28 Perforation Treatment Performed - Jet Perforation
1985-03-02 Perforation Treatment Performed - Open-Hole Completion
1985-03-05 Perforation Treatment Performed - Jet Perforation
1985-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-06 Perforation Treatment Performed - Cement Plug
1985-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-08 Perforation Treatment Performed - Jet Perforation
1985-03-08 Perforation Treatment Performed - Open-Hole Completion
1988-10-18 Well Fluid changed to Crude Oil
1988-10-18 Well Mode changed to Pumping
1988-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-01-01 Well Fluid changed to Crude Oil
1989-01-01 Well Mode changed to Suspended
1991-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-09 Perforation Treatment Performed - Jet Perforation
1991-10-09 Perforation Treatment Performed - Remedial Casing
1991-10-09 Well Fluid changed to Crude Oil
1991-10-09 Well Mode changed to Abandoned
1991-11-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-01-12 Open Hole/Barefoot Completion 1577.30 1601.10 0
1983-10-01 Perforation 1576.60 1581.00 13
1983-10-01 Acid Treatment 1576.60 1581.60 0
1985-02-23 Open Hole/Barefoot Completion 1577.30 1590.00 0
1985-02-28 Perforation 1580.50 1585.50 13
1985-02-28 Acid Treatment 1580.50 1585.50 0
1985-02-28 Cement Squeeze 1576.60 1585.50 0
1985-02-28 Cement Plug 1587.30 1590.00 0
1985-03-02 Open Hole/Barefoot Completion 1577.30 1587.30 0
1985-03-05 Perforation 1580.50 1585.50 13
1985-03-06 Acid Treatment 1580.50 1585.50 0
1975-11-22 Cement Plug 1582.80 1601.10 0
1985-03-06 Cement Plug 1582.00 1587.30 0
1985-03-08 Open Hole/Barefoot Completion 1577.30 1582.00 0
1985-03-08 Perforation 1576.30 1580.70 13
1985-03-08 Acid Treatment 1576.30 1582.00 0
1988-12-05 Packing Device Capped w/Cement 1559.00 1570.00 0
1991-10-09 Perforation 208.60 209.10 13
1991-10-09 Remedial Casing Cementing 208.60 209.10 0
1991-10-09 Packing Device Capped w/Cement 204.00 204.00 0
1975-11-22 Open Hole/Barefoot Completion 1577.30 1582.80 0
1978-06-27 Perforation 1577.60 1581.30 13
1978-06-27 Cement Plug 1587.70 1601.10 0
1978-06-28 Cement Plug 1582.80 1601.10 0
1978-06-28 Open Hole/Barefoot Completion 1577.30 1582.80 0
1983-09-29 Cement Plug 1581.60 1582.80 0
1983-09-29 Open Hole/Barefoot Completion 1577.30 1581.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4008 0.0 0.0 0.0
1968 3782 0.0 0.0 0.0
1969 4815 0.0 0.0 0.0
1970 5057 0.0 0.0 0.0
1971 5630 0.0 0.0 0.0
1972 6002 0.0 0.0 0.0
1973 6393 0.0 0.0 0.0
1974 6815 0.0 0.0 0.0
1975 5686 0.0 0.0 0.0
1976 5454 0.0 0.0 0.0
1977 5688 0.0 0.0 0.0
1978 6679 0.0 0.0 0.0
1979 5946 0.0 0.0 0.0
1980 6729 0.0 0.0 0.0
1981 7039 0.0 0.0 0.0
1982 5883 0.0 0.0 0.0
1983 5019 0.0 0.0 0.0
1984 7166 0.0 0.0 0.0
1985 7156 0.0 0.0 0.0
1986 8730 0.0 0.0 0.0
1987 8400 0.0 0.0 0.0
1988 6571 0.0 0.0 0.0

For data sources see[5]

References