X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364202311000

Well Details

Well ID: 0364202311000
Loading map...
Location: 00/11-23-036-20W4/0
Location Alias: 00/11-23-36-20 W4M
Location Alias 2: 00/11-23-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 23
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 11-23-36-20
Operator Name: Cona Resources Ltd.
License Number: 0003994
License Date: 1951-12-22
License Status: Abandoned
Spud Date: 1952-01-09
Final Drill Date: 1952-02-08
Well Total Depth: 1630.70 m
Surface Hole Latitude: 52.108296
Surface Hole Longitude: -112.757969

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-12-22 Obtained License
1952-02-05 Drill Stem Test Performed
1952-02-08 Drill Stem Test Performed
1952-02-08 Finished Drilling
1952-02-08 Well Mode changed to Drilled and Cased
1952-02-09 Drill Stem Test Performed
1952-02-11 Production Casing Operation Performed
1952-02-13 Perforation Treatment Performed - Open-Hole Completion
1952-02-18 Well Began Production
1952-02-18 Well Fluid changed to Crude Oil
1952-02-18 Well Mode changed to Flowing
1973-05-30 Perforation Treatment Performed - Cement Plug
1973-05-30 Perforation Treatment Performed - Open-Hole Completion
1976-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-09-25 Perforation Treatment Performed - Open-Hole Completion
1979-09-26 Perforation Treatment Performed - Cement Plug
1979-09-26 Perforation Treatment Performed - Open-Hole Completion
1979-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-04 Well Fluid changed to Crude Oil
1979-12-04 Well Mode changed to Pumping
1980-04-11 Perforation Treatment Performed - Open-Hole Completion
1980-04-24 Perforation Treatment Performed - Cement Plug
1980-04-24 Perforation Treatment Performed - Open-Hole Completion
1980-04-26 Perforation Treatment Performed - Jet Perforation
1980-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-09 Perforation Treatment Performed - Cement Plug
1981-06-09 Perforation Treatment Performed - Open-Hole Completion
1981-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-12 Perforation Treatment Performed - Jet Perforation
1982-03-12 Perforation Treatment Performed - Jet Perforation
1982-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-18 Perforation Treatment Performed - Cement Plug
1982-03-18 Perforation Treatment Performed - Jet Perforation
1982-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-08 Well Log Performed
1984-03-15 Well Fluid changed to Crude Oil
1984-03-15 Well Mode changed to Suspended
1996-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-21 Perforation Treatment Performed - Jet Perforation
1996-06-21 Plug Back Performed
1996-06-22 Perforation Treatment Performed - Remedial Casing
1996-06-25 Perforation Treatment Performed - Cement Plug
1996-06-25 Well Fluid changed to Crude Oil
1996-06-25 Well Mode changed to Abandoned Zone
1996-07-16 Well Abandoned
1996-07-16 Well Fluid changed to Crude Oil
1996-07-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-02-13 Open Hole/Barefoot Completion 1584.40 1616.40 0
1980-04-24 Cement Plug 1602.60 1612.00 0
1980-04-24 Open Hole/Barefoot Completion 1584.90 1602.60 0
1980-04-26 Perforation 1586.00 1591.00 13
1980-04-29 Acid Treatment 1584.90 1602.60 0
1981-06-09 Cement Plug 1595.00 1607.00 0
1981-06-09 Open Hole/Barefoot Completion 1584.90 1595.00 0
1981-06-12 Perforation 1585.00 1589.50 13
1981-06-12 Acid Treatment 1585.00 1589.50 0
1982-03-12 Perforation 1593.00 1595.00 13
1982-03-13 Acid Treatment 1585.00 1595.00 0
1973-05-30 Cement Plug 1599.00 1616.40 0
1982-03-18 Cement Plug 1591.00 1595.00 0
1982-03-18 Perforation 1583.10 1586.20 13
1982-03-19 Acid Treatment 1583.10 1586.20 0
1996-06-21 Packing Device Capped w/Cement 1542.00 1550.00 0
1996-06-21 Perforation 271.00 272.00 13
1996-06-22 Remedial Casing Cementing 271.00 272.00 0
1996-06-25 Cement Plug 145.00 272.00 0
1973-05-30 Open Hole/Barefoot Completion 1584.40 1599.00 0
1976-08-20 Packing Device Capped w/Cement 1582.50 1588.30 0
1979-09-25 Open Hole/Barefoot Completion 1584.90 1603.20 0
1979-09-26 Cement Plug 1591.60 1603.00 0
1979-09-26 Open Hole/Barefoot Completion 1584.90 1591.60 0
1979-09-27 Acid Treatment 1584.90 1591.60 0
1980-04-11 Open Hole/Barefoot Completion 1584.90 1612.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1973 3078 0.0 0.0 0.0
1974 6526 0.0 0.0 0.0
1975 6402 0.0 0.0 0.0
1976 5238 0.0 0.0 0.0
1977 4692 0.0 0.0 0.0
1978 4980 0.0 0.0 0.0
1979 7016 0.0 0.0 0.0
1980 5075 0.0 0.0 0.0
1981 6873 0.0 0.0 0.0
1982 5263 0.0 0.0 0.0
1983 3831 0.0 0.0 0.0

For data sources see[5]

References