If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364202604000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.115711,"lon":-112.763114,"icon":""}]} |
Location: 00/04-26-036-20W4/0 | |
Location Alias: 00/04-26-36-20 W4M | |
Location Alias 2: 00/04-26-036-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 20 | |
Section: 26 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: IMP HB FENN BV 4-26N-36-20 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0005449 | |
License Date: 1952-10-07 | |
License Status: RecCertified | |
Spud Date: 1952-10-17 | |
Final Drill Date: 1952-12-20 | |
Well Total Depth: 1629.50 m | |
Surface Hole Latitude: 52.115711 | |
Surface Hole Longitude: -112.763114 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-10-07 | Obtained License |
1952-12-17 | Production Casing Operation Performed |
1952-12-20 | Drill Stem Test Performed |
1952-12-20 | Finished Drilling |
1952-12-20 | Well Mode changed to Drilled and Cased |
1952-12-23 | Perforation Treatment Performed - Bullet Perforation |
1952-12-30 | Well Began Production |
1952-12-30 | Well Fluid changed to Crude Oil |
1952-12-30 | Well Mode changed to Flowing |
1980-05-05 | Well Fluid changed to Crude Oil |
1980-05-05 | Well Mode changed to Pumping |
1984-05-30 | Perforation Treatment Performed - Cement Plug |
1984-06-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-12-11 | Perforation Treatment Performed - Cement Squeeze |
1985-12-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-12-12 | Perforation Treatment Performed - Jet Perforation |
1989-01-16 | Well Fluid changed to Crude Oil |
1989-01-16 | Well Mode changed to Suspended |
1990-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-10-17 | Perforation Treatment Performed - Jet Perforation |
1990-10-17 | Plug Back Performed |
1990-10-17 | Well Log Performed |
1990-10-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-10-18 | Perforation Treatment Performed - Cement Squeeze |
1990-10-18 | Well Fluid changed to Crude Oil |
1990-10-18 | Well Mode changed to Abandoned |
1990-10-29 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-12-23 | Bullet Perforation | 1585.60 | 1595.60 | 13 |
1990-10-18 | Cement Squeeze | 215.60 | 216.10 | 0 |
1990-10-18 | Packing Device Capped w/Cement | 202.60 | 210.60 | 0 |
1984-05-30 | Cement Plug | 1588.30 | 1599.60 | 0 |
1984-06-02 | Acid Treatment | 1585.60 | 1588.30 | 13 |
1985-12-11 | Cement Squeeze | 1585.60 | 1588.30 | 0 |
1985-12-12 | Perforation | 1583.00 | 1584.60 | 13 |
1985-12-12 | Acid Treatment | 1583.00 | 1584.60 | 0 |
1990-10-17 | Packing Device Capped w/Cement | 1565.00 | 1573.00 | 0 |
1990-10-17 | Packing Device Capped w/Cement | 919.60 | 927.60 | 0 |
1990-10-17 | Perforation | 215.60 | 216.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 1488 | 0.0 | 0.0 | 0.0 |
1980 | 4960 | 0.0 | 0.0 | 0.0 |
1981 | 6864 | 0.0 | 0.0 | 0.0 |
1982 | 5525 | 0.0 | 0.0 | 0.0 |
1983 | 1230 | 0.0 | 0.0 | 0.0 |
1984 | 4500 | 0.0 | 0.0 | 0.0 |
1985 | 5607 | 0.0 | 0.0 | 0.0 |
1986 | 8142 | 0.0 | 0.0 | 0.0 |
1987 | 7776 | 0.0 | 0.0 | 0.0 |
1988 | 7242 | 0.0 | 0.0 | 0.0 |
1989 | 356 | 0.0 | 0.0 | 0.0 |
For data sources see[5]