X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364212906030

Well Details

Well ID: 0364212906030
Loading map...
Location: 03/06-29-036-21W4/0
Location Alias: 03/06-29-36-21 W4M
Location Alias 2: 03/06-29-036-21 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 21
Section: 29
County/Municipality: County of Stettler No. 6
Well Name: EMBER 103 FENNW 6-29-36-21
Operator Name: Ember Resources Inc.
License Number: 0349228
License Date: 2006-01-17
License Status: Issued
Spud Date: 2006-01-28
Final Drill Date: 2006-01-31
Well Total Depth: 832.50 m
Surface Hole Latitude: 52.117698
Surface Hole Longitude: -112.974336

For data sources see[1][2]

Well History

Date Event
2006-01-17 Obtained License
2006-01-29 Surface Casing Operation Performed
2006-01-31 Finished Drilling
2006-01-31 Production Casing Operation Performed
2006-01-31 Rig Released
2006-01-31 Well Mode changed to Drilled and Cased
2006-02-09 Well Log Performed
2006-02-17 Perforation Treatment Performed - Jet Perforation
2006-02-17 Well Log Performed
2006-05-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-05-09 Perforation Treatment Performed - Jet Perforation
2006-05-09 Plug Back Performed
2006-05-09 Well Log Performed
2006-05-09 Well Mode changed to Abandoned Zone
2006-05-19 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-17 Perforation 756.40 758.00 17
2006-05-09 Perforation 382.90 383.50 17
2006-05-09 Perforation 378.10 380.10 17
2006-05-09 Perforation 373.10 373.40 17
2006-05-09 Perforation 357.70 358.10 17
2006-05-09 Perforation 355.80 356.90 17
2006-05-09 Perforation 352.30 353.80 17
2006-05-09 Perforation 343.40 345.20 17
2006-05-09 Perforation 321.00 321.70 17
2006-05-09 Perforation 309.20 309.50 17
2006-05-19 Fracture 309.20 473.40 0
2006-02-17 Perforation 754.00 755.50 17
2006-02-17 Perforation 523.50 527.00 17
2006-05-09 Packing Device Capped w/Cement 513.50 521.50 0
2006-05-09 Perforation 473.10 473.40 17
2006-05-09 Perforation 452.90 453.20 17
2006-05-09 Perforation 436.70 438.20 17
2006-05-09 Perforation 421.20 421.90 17
2006-05-09 Perforation 394.60 395.40 17

For data sources see[4]



References