X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365052511002

Well Details

Well ID: 0365052511002
Loading map...
Location: 00/11-25-036-05W5/2
Location Alias: 00/11-25-36-05 W5M
Location Alias 2: 00/11-25-036-05 W5/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 05
Section: 25
County/Municipality: Clearwater County
Well Name: PCP GARRINGTON 11-25-36-5
Operator Name: Ovintiv Canada ULC
License Number: 0072990
License Date: 1978-11-15
License Status: RecCertified
Spud Date: 1978-12-12
Final Drill Date: 1979-02-11
Well Total Depth: 2555.00 m
Surface Hole Latitude: 52.125471
Surface Hole Longitude: -114.589531

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-11-15 Obtained License
1979-02-11 Finished Drilling
1979-02-11 Well Mode changed to Drilled and Cased
1979-02-28 Production Casing Operation Performed
1979-09-12 Perforation Treatment Performed - Jet Perforation
1979-10-05 Perforation Treatment Performed - Fractured
1981-07-07 Perforation Treatment Performed - Jet Perforation
1981-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-14 Perforation Treatment Performed - Jet Perforation
1983-03-01 Well Fluid changed to Crude Oil
1983-03-01 Well Mode changed to Potential
1983-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-03-08 Well Fluid changed to Crude Oil
1983-03-08 Well Mode changed to Abandoned and Re-entered
1985-03-12 Well Log Performed
1985-03-14 Well Log Performed
1985-06-09 Well Log Performed
1988-03-21 Well Log Performed
1988-10-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-12 Perforation 2510.50 2514.50 6
1979-10-05 Fracture 2510.50 2514.50 0
1981-07-07 Perforation 2457.50 2462.50 7
1981-07-09 Acid Treatment 2457.50 2462.50 0
1981-07-11 Packing Device Capped w/Cement 2462.00 2470.00 0
1981-07-11 Packing Device Capped w/Cement 2432.00 2440.00 0
1981-07-14 Perforation 2252.00 2253.50 7
1981-07-14 Acid Treatment 2252.00 2253.50 0
1983-03-08 Packing Device Capped w/Cement 2232.00 2240.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 24 0.0 0.0 0.0

For data sources see[5]

References