X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374173516000

Well Details

Well ID: 0374173516000
Loading map...
Location: 00/16-35-037-17W4/0
Location Alias: 00/16-35-37-17 W4M
Location Alias 2: 00/16-35-037-17 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 17
Section: 35
County/Municipality: County of Stettler No. 6
Well Name: LOGIC ENERGY HALKIRK 16-35-37-17
Operator Name: Logic Energy Ltd.
License Number: 0113409
License Date: 1985-02-15
License Status: Issued
Spud Date: 1985-03-28
Final Drill Date: 1985-04-09
Well Total Depth: 1455.00 m
Surface Hole Latitude: 52.229717
Surface Hole Longitude: -112.320043

For data sources see[1][2]

Well History

Date Event
1985-02-15 Obtained License
1985-03-30 Surface Casing Operation Performed
1985-04-09 Finished Drilling
1985-04-09 Well Log Performed
1985-04-09 Well Mode changed to Drilled and Cased
1985-04-10 Drill Stem Test Performed
1985-04-11 Production Casing Operation Performed
1985-04-11 Rig Released
1985-05-16 Well Log Performed
1985-05-17 Perforation Treatment Performed - Jet Perforation
1985-07-09 Well Began Production
1985-07-09 Well Fluid changed to Crude Oil
1985-07-09 Well Mode changed to Flowing
1987-09-25 Well Fluid changed to Crude Oil
1987-09-25 Well Mode changed to Pumping
1994-02-03 Well Fluid changed to Crude Oil
1994-02-03 Well Mode changed to Suspended
1995-11-30 Perforation Treatment Performed - Jet Perforation
1995-11-30 Well Log Performed
1995-12-01 Well Log Performed
1996-01-01 Well Began Injection
1996-01-01 Well Fluid changed to Water
1996-01-01 Well Type changed to Injection
1998-10-26 Perforation Treatment Performed - Chemical Squeeze
1998-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-17 Perforation 1240.00 1245.00 13
1995-11-30 Perforation 1246.50 1257.50 13
1998-10-26 Chemical Squeeze 1240.00 1257.50 0
1998-10-28 Acid Treatment 1240.00 1257.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 3387 0.0 0.0 0.0
1986 4376 0.0 0.0 0.0
1987 6142 0.0 0.0 0.0
1988 8458 0.0 0.0 0.0
1989 8337 0.0 0.0 0.0
1990 8298 0.0 0.0 0.0
1991 8359 0.0 0.0 0.0
1992 8414 0.0 0.0 0.0
1993 1432 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References