X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374200207000

Well Details

Well ID: 0374200207000
Loading map...
Location: 00/07-02-037-20W4/0
Location Alias: 00/07-02-37-20 W4M
Location Alias 2: 00/07-02-037-20 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 20
Section: 02
County/Municipality: County of Stettler No. 6
Well Name: IMPERIAL OXYOKE 7-2N-37-20
Operator Name: Imperial Oil Resources Limited
License Number: 0010574
License Date: 1955-12-02
License Status: Abandoned
Spud Date: 1955-12-21
Final Drill Date: 1956-01-20
Well Total Depth: 1669.40 m
Surface Hole Latitude: 52.148039
Surface Hole Longitude: -112.751995

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-12-02 Obtained License
1956-01-13 Drill Stem Test Performed
1956-01-14 Production Casing Operation Performed
1956-01-19 Drill Stem Test Performed
1956-01-20 Finished Drilling
1956-01-20 Perforation Treatment Performed - Open-Hole Completion
1956-01-20 Well Mode changed to Drilled and Cased
1956-01-21 Drill Stem Test Performed
1956-01-28 Well Began Production
1956-01-28 Well Fluid changed to Crude Oil
1956-01-28 Well Mode changed to Flowing
1970-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-19 Well Fluid changed to Crude Oil
1971-02-19 Well Mode changed to Pumping
1976-02-01 Well Fluid changed to Crude Oil
1976-02-01 Well Mode changed to Suspended
1979-04-26 Perforation Treatment Performed - Cement Plug
1979-04-26 Perforation Treatment Performed - Open-Hole Completion
1979-05-17 Perforation Treatment Performed - Cement Plug
1979-05-17 Perforation Treatment Performed - Jet Perforation
1979-05-17 Perforation Treatment Performed - Open-Hole Completion
1979-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-24 Perforation Treatment Performed - Cement Plug
1979-08-24 Perforation Treatment Performed - Open-Hole Completion
1984-06-25 Perforation Treatment Performed - Open-Hole Completion
1984-06-26 Well Log Performed
1984-06-28 Well Log Performed
1984-07-04 Liner Casing Operation Performed
1984-07-04 Perforation Treatment Performed - Cement Squeeze
1984-07-04 Well Fluid changed to Crude Oil
1984-07-04 Well Mode changed to Abandoned Zone
1984-07-07 Perforation Treatment Performed - Jet Perforation
1984-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-14 Plug Back Performed
1985-05-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-05-03 Perforation Treatment Performed - Jet Perforation
1985-05-03 Plug Back Performed
1985-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-05 Perforation Treatment Performed - Jet Perforation
1990-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-19 Perforation Treatment Performed - Jet Perforation
1990-09-19 Plug Back Performed
1990-09-19 Well Log Performed
1990-09-20 Perforation Treatment Performed - Remedial Casing
1990-10-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-01-20 Open Hole/Barefoot Completion 1602.90 1631.60 0
1979-08-24 Cement Plug 1606.20 1606.30 0
1979-08-24 Open Hole/Barefoot Completion 1602.90 1615.40 0
1984-06-25 Open Hole/Barefoot Completion 1602.90 1669.40 0
1984-07-04 Cement Squeeze 1591.10 1669.40 0
1984-07-07 Perforation 1650.00 1652.00 0
1984-07-08 Acid Treatment 1650.00 1652.00 0
1985-05-03 Packing Device Capped w/Cement 1637.00 1645.00 0
1985-05-03 Perforation 1590.00 1598.50 13
1985-05-04 Acid Treatment 1590.00 1598.50 0
1985-05-05 Perforation 1593.60 1600.00 13
1970-01-23 Acid Treatment 1602.90 1613.90 0
1985-05-05 Acid Treatment 1593.60 1600.00 0
1990-09-19 Packing Device Capped w/Cement 1574.00 1582.00 0
1990-09-19 Perforation 228.00 228.50 13
1990-09-19 Acid Treatment 228.00 228.50 0
1990-09-20 Remedial Casing Cementing 228.00 228.50 0
1979-04-26 Cement Plug 1613.30 1631.60 0
1979-04-26 Open Hole/Barefoot Completion 1602.90 1613.30 0
1979-05-17 Cement Plug 1606.60 1613.30 0
1979-05-17 Open Hole/Barefoot Completion 1602.90 1606.60 0
1979-05-17 Perforation 1591.10 1602.90 7
1979-07-16 Acid Treatment 1591.10 1606.60 0
1979-08-24 Acid Treatment 1591.10 1604.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6614 0.0 0.0 0.0
1968 6139 0.0 0.0 0.0
1969 6846 0.0 0.0 0.0
1970 6873 0.0 0.0 0.0
1971 7550 0.0 0.0 0.0
1972 6514 0.0 0.0 0.0
1973 7807 0.0 0.0 0.0
1974 7365 0.0 0.0 0.0
1975 7951 0.0 0.0 0.0
1976 739 0.0 0.0 0.0
1977 3491 0.0 0.0 0.0
1978 6492 0.0 0.0 0.0
1979 5560 0.0 0.0 0.0
1980 1895 0.0 0.0 0.0
1981 314 0.0 0.0 0.0
1982 1778 0.0 0.0 0.0
1983 3382 0.0 0.0 0.0

For data sources see[5]

References