X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374230210000

Well Details

Well ID: 0374230210000
Loading map...
Location: 00/10-02-037-23W4/0
Location Alias: 00/10-02-37-23 W4M
Location Alias 2: 00/10-02-037-23 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 23
Section: 02
County/Municipality: Red Deer County
Well Name: VERMILION ET AL MIKWAN 10-2-37-23
Operator Name: Vermilion Energy Inc.
License Number: 0064907
License Date: 1977-07-22
License Status: Abandoned
Spud Date: 1977-08-04
Final Drill Date: 1977-08-12
Well Total Depth: 1613.00 m
Surface Hole Latitude: 52.152484
Surface Hole Longitude: -113.178235

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-07-22 Obtained License
1977-08-10 Drill Stem Test Performed
1977-08-12 Finished Drilling
1977-08-13 Drill Stem Test Performed
1977-08-14 Drill Stem Test Performed
1977-08-15 Production Casing Operation Performed
1977-08-15 Well Mode changed to Drilled and Cased
1977-11-19 Well Log Performed
1977-11-20 Perforation Treatment Performed - Jet Perforation
1985-12-19 Well Began Production
1985-12-19 Well Fluid changed to Gas
1985-12-19 Well Mode changed to Flowing
1990-10-29 Well Log Performed
1990-10-31 Perforation Treatment Performed - Jet Perforation
1990-10-31 Well Fluid changed to Gas
1990-10-31 Well Mode changed to Flowing
1996-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-06 Plug Back Performed
1996-02-06 Well Fluid changed to Gas
1996-02-06 Well Log Performed
1996-02-06 Well Mode changed to Abandoned Zone
1996-02-08 Perforation Treatment Performed - Fractured
1996-02-08 Perforation Treatment Performed - Jet Perforation
1997-04-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-04-08 Plug Back Performed
1997-04-08 Well Log Performed
1997-04-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-20 Perforation 1565.80 1567.90 7
1990-10-31 Perforation 1593.50 1595.30 13
1996-02-06 Packing Device Capped w/Cement 1547.00 1550.00 0
1996-02-08 Perforation 1393.50 1394.70 13
1996-02-08 Perforation 1396.00 1397.20 13
1996-02-08 Fracture 1393.50 1397.20 0
1997-04-08 Packing Device Capped w/Cement 1455.00 1463.00 0
1997-04-08 Packing Device Capped w/Cement 1382.50 1390.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 301 0.0 0.0 0.0
1986 2591 0.0 0.0 0.0
1987 4149 0.0 0.0 0.0
1988 8472 0.0 0.0 0.0
1989 514 0.0 0.0 0.0
1990 415 0.0 0.0 0.0
1992 177 0.0 0.0 0.0

For data sources see[5]

References