X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384032203032

Well Details

Well ID: 0384032203032
Loading map...
Location: 03/03-22-038-03W4/2
Location Alias: 03/03-22-38-03 W4M
Location Alias 2: 03/03-22-038-03 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 03
Section: 22
County/Municipality: Municipal District of Provost No. 52
Well Name: KING PROVO 3-22-38-3
Operator Name: Alston Energy Inc.
License Number: 0207383
License Date: 1997-10-20
License Status: Abandoned
Spud Date: 1997-10-29
Final Drill Date: 1997-11-01
Well Total Depth: 869.00 m
Surface Hole Latitude: 52.276215
Surface Hole Longitude: -110.355690

For data sources see[1][2]

Well History

Date Event
1997-10-20 Obtained License
1997-10-30 Surface Casing Operation Performed
1997-11-01 Finished Drilling
1997-11-01 Well Log Performed
1997-11-01 Well Mode changed to Drilled and Cased
1997-11-02 Production Casing Operation Performed
1997-11-02 Rig Released
1997-11-05 Perforation Treatment Performed - Jet Perforation
1997-11-05 Well Log Performed
2008-05-29 Perforation Treatment Performed - Jet Perforation
2008-06-02 Perforation Treatment Performed - Fractured
2008-06-27 Well Began Production
2008-06-27 Well Fluid changed to Crude Oil
2008-06-27 Well Mode changed to Pumping
2012-04-30 Well Fluid changed to Crude Oil
2012-04-30 Well Mode changed to Suspended
2017-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-09-20 Plug Back Performed
2017-09-20 Well Fluid changed to Crude Oil
2017-09-20 Well Mode changed to Abandoned Zone
2017-11-28 Well Abandoned
2017-11-28 Well Fluid changed to Crude Oil
2017-11-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-11-05 Perforation 829.70 831.40 18
1997-11-05 Perforation 833.00 833.50 18
2008-05-29 Perforation 786.00 790.00 17
2008-06-02 Fracture 786.00 790.00 0
2017-09-20 Packing Device Capped w/Cement 809.90 817.90 0
2017-09-20 Packing Device Capped w/Cement 771.20 779.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 4275 0.0 0.0 0.0
2009 2548 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References