X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385031803000

Well Details

Well ID: 0385031803000
Loading map...
Location: 00/03-18-038-03W5/0
Location Alias: 00/03-18-38-03 W5M
Location Alias 2: 00/03-18-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 18
County/Municipality: Red Deer County
Well Name: TEXACO MCCOLL HESPERO A3-18
Operator Name: Imperial Oil Resources Limited
License Number: 0009484
License Date: 1955-05-25
License Status: Abandoned
Spud Date: 1955-06-06
Final Drill Date: 1955-09-16
Well Total Depth: 2847.40 m
Surface Hole Latitude: 52.262756
Surface Hole Longitude: -114.421077

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-05-25 Obtained License
1955-07-25 Drill Stem Test Performed
1955-08-01 Drill Stem Test Performed
1955-08-03 Drill Stem Test Performed
1955-09-07 Drill Stem Test Performed
1955-09-11 Drill Stem Test Performed
1955-09-14 Drill Stem Test Performed
1955-09-16 Drill Stem Test Performed
1955-09-16 Finished Drilling
1955-09-20 Liner Casing Operation Performed
1955-09-23 Perforation Treatment Performed - Bullet Perforation
1955-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-09-29 Perforation Treatment Performed - Bullet Perforation
1955-09-29 Perforation Treatment Performed - Jet Perforation
1955-10-02 Perforation Treatment Performed - Cement Squeeze
1955-10-03 Perforation Treatment Performed - Bullet Perforation
1955-10-05 Perforation Treatment Performed - Cement Squeeze
1955-10-09 Perforation Treatment Performed - Bullet Perforation
1955-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-10-14 Perforation Treatment Performed - Cement Squeeze
1955-10-18 Perforation Treatment Performed - Bullet Perforation
1955-10-19 Well Mode changed to Drilled and Cased
1972-03-23 Well Began Production
1972-03-23 Well Fluid changed to Gas
1972-03-23 Well Mode changed to Flowing
1974-10-21 Perforation Treatment Performed - Fractured
1974-11-03 Perforation Treatment Performed - Cement Squeeze
1979-06-15 Well Log Performed
1980-01-01 Well Fluid changed to Gas
1980-01-01 Well Mode changed to Suspended
1980-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-20 Well Abandoned
1980-11-20 Well Fluid changed to Gas
1980-11-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-09-23 Bullet Perforation 2280.50 2283.90 13
1955-10-09 Bullet Perforation 1727.00 1730.70 13
1955-10-11 Acid Treatment 1723.30 1725.80 0
1955-10-14 Cement Squeeze 1723.30 1730.70 0
1955-10-18 Bullet Perforation 2192.70 2195.80 13
1974-10-21 Fracture 2192.70 2195.80 0
1974-11-03 Cement Squeeze 1630.70 1734.90 0
1980-11-20 Packing Device Capped w/Cement 2185.00 2185.00 0
1980-11-20 Packing Device Capped w/Cement 1620.00 1620.00 0
1955-09-25 Acid Treatment 2280.50 2283.90 0
1955-09-28 Packing Device Capped w/Cement 2273.80 2273.80 0
1955-09-29 Bullet Perforation 1751.10 1752.60 13
1955-09-29 Perforation 1630.70 1631.30 26
1955-10-02 Cement Squeeze 1630.70 1752.60 0
1955-10-03 Bullet Perforation 1734.30 1734.90 20
1955-10-05 Cement Squeeze 1734.30 1734.90 0
1955-10-09 Bullet Perforation 1723.30 1725.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 5850 0.0 0.0 0.0
1973 1290 0.0 0.0 0.0
1975 616 0.0 0.0 0.0
1977 530 0.0 0.0 0.0
1978 4216 0.0 0.0 0.0

For data sources see[5]

References