X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394202507004

Well Details

Well ID: 0394202507004
Loading map...
Location: 00/07-25-039-20W4/4
Location Alias: 00/07-25-39-20 W4M
Location Alias 2: 00/07-25-039-20 W4/04
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 20
Section: 25
County/Municipality: County of Stettler No. 6
Well Name: BAYTEX ET AL STETN 7-25-39-20
Operator Name: Baytex Energy Ltd.
License Number: 0174991
License Date: 1995-01-16
License Status: Suspension
Spud Date: 1995-01-20
Final Drill Date: 1995-01-25
Well Total Depth: 1385.00 m
Surface Hole Latitude: 52.383186
Surface Hole Longitude: -112.749340

For data sources see[1][2]

Well History

Date Event
1995-01-16 Obtained License
1995-01-21 Surface Casing Operation Performed
1995-01-25 Finished Drilling
1995-01-25 Well Mode changed to Drilled and Cased
1995-01-26 Drill Stem Test Performed
1995-01-26 Well Log Performed
1995-01-28 Production Casing Operation Performed
1995-01-28 Rig Released
1995-02-03 Well Log Performed
1995-02-04 Perforation Treatment Performed - Jet Perforation
1995-02-04 Well Log Performed
1995-08-15 Perforation Treatment Performed - Jet Perforation
1997-03-01 Perforation Treatment Performed - Jet Perforation
1997-03-01 Well Log Performed
1997-12-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-22 Plug Back Performed
1997-12-22 Well Log Performed
1997-12-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-23 Plug Back Performed
1997-12-24 Perforation Treatment Performed - Jet Perforation
1997-12-28 Perforation Treatment Performed - Fractured
2004-01-01 Well Began Production
2004-01-01 Well Fluid changed to Gas
2004-01-01 Well Mode changed to Flowing
2019-09-30 Well Fluid changed to Gas
2019-09-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-02-04 Perforation 1352.50 1354.00 13
1997-12-28 Fracture 342.00 345.00 0
1995-08-15 Perforation 1150.00 1152.00 14
1997-03-01 Perforation 1310.50 1311.50 20
1997-03-01 Perforation 1323.00 1326.00 20
1997-03-01 Perforation 1327.50 1329.00 20
1997-12-22 Packing Device Capped w/Cement 1335.00 1343.00 0
1997-12-23 Packing Device Capped w/Cement 1132.00 1140.00 0
1997-12-23 Packing Device Capped w/Cement 1292.00 1300.00 0
1997-12-24 Perforation 342.00 345.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 8648 0.0 0.0 0.0
2005 8754 0.0 0.0 0.0
2006 8749 0.0 0.0 0.0
2007 8001 0.0 0.0 0.0
2008 8750 0.0 0.0 0.0
2009 8421 0.0 0.0 0.0
2010 8659 0.0 0.0 0.0
2011 8734 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8375 0.0 0.0 0.0
2014 5767 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8614 0.0 0.0 0.0
2018 5087 0.0 0.0 0.0

For data sources see[5]

References