X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395010910000

Well Details

Well ID: 0395010910000
Loading map...
Location: 00/10-09-039-01W5/0
Location Alias: 00/10-09-39-01 W5M
Location Alias 2: 00/10-09-039-01 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 01
Section: 09
County/Municipality: Red Deer County
Well Name: OMERS ENERGY PREVO 10-9-39-1
Operator Name: Gain Energy Ltd.
License Number: 0060550
License Date: 1976-10-07
License Status: Abandoned
Spud Date: 1976-10-15
Final Drill Date: 1976-11-15
Well Total Depth: 2428.60 m
Surface Hole Latitude: 52.344075
Surface Hole Longitude: -114.067202

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-10-07 Obtained License
1976-10-15 Direction Drilling Operation Performed - 98
1976-11-10 Well Log Performed
1976-11-15 Finished Drilling
1976-11-15 Production Casing Operation Performed
1976-11-15 Well Mode changed to Drilled and Cased
1976-12-10 Perforation Treatment Performed - Jet Perforation
1976-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-16 Perforation Treatment Performed - Jet Perforation
1976-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-06-16 Well Began Production
1977-06-16 Well Fluid changed to Gas
1977-06-16 Well Mode changed to Flowing
1978-10-26 Perforation Treatment Performed - Jet Perforation
1978-10-27 Perforation Treatment Performed - Jet Perforation
1979-01-19 Well Fluid changed to Gas
1979-01-19 Well Mode changed to Suspended
1979-02-01 Well Log Performed
1979-02-03 Perforation Treatment Performed - Jet Perforation
1979-02-03 Well Fluid changed to Gas
1979-02-03 Well Mode changed to Flowing
1990-06-19 Perforation Treatment Performed - Jet Perforation
1990-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-03-31 Well Fluid changed to Gas
2014-03-31 Well Mode changed to Suspended
2015-12-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-12-23 Plug Back Performed
2015-12-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-12-28 Plug Back Performed
2015-12-28 Well Fluid changed to Gas
2015-12-28 Well Mode changed to Abandoned Zone
2016-02-01 Perforation Treatment Performed - Jet Perforation
2016-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-02 Plug Back Performed
2016-02-03 Perforation Treatment Performed - Jet Perforation
2016-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-04 Plug Back Performed
2016-02-05 Perforation Treatment Performed - Jet Perforation
2016-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-06 Plug Back Performed
2016-02-11 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1976-10-15 486.50 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-12-10 Perforation 2386.00 2390.90 7
1979-02-03 Perforation 2295.40 2297.30 7
1990-06-19 Perforation 2337.90 2340.90 13
1990-06-19 Perforation 2343.30 2347.00 13
1990-06-19 Perforation 2350.60 2355.60 13
1990-06-19 Perforation 2358.50 2366.50 13
1990-06-19 Perforation 2369.50 2371.50 13
1990-06-20 Acid Treatment 2337.90 2371.50 0
2015-12-23 Packing Device Capped w/Cement 2367.60 2376.60 0
2015-12-28 Packing Device Capped w/Cement 2321.00 2330.00 0
2015-12-28 Packing Device Capped w/Cement 2281.00 2290.00 0
1976-12-10 Perforation 2386.60 2391.50 7
2016-02-01 Perforation 1750.00 1751.00 17
2016-02-02 Packing Device Capped w/Cement 1735.00 1743.00 0
2016-02-03 Perforation 1325.00 1326.00 17
2016-02-03 Perforation 1001.00 1002.00 17
2016-02-04 Packing Device Capped w/Cement 1143.00 1349.00 0
2016-02-05 Perforation 475.00 476.00 17
2016-02-05 Perforation 465.00 466.00 17
2016-02-05 Perforation 386.00 387.00 17
2016-02-06 Packing Device Capped w/Cement 362.00 370.00 0
1976-12-11 Acid Treatment 2386.00 2391.50 0
1976-12-16 Perforation 2338.40 2340.30 7
1976-12-16 Perforation 2343.30 2347.00 7
1976-12-16 Perforation 2350.60 2354.60 7
1976-12-17 Acid Treatment 2338.40 2354.60 0
1978-10-26 Perforation 2358.80 2362.50 7
1978-10-27 Perforation 2358.80 2362.50 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 2766 0.0 0.0 0.0
1978 4883 0.0 0.0 0.0
1979 456 0.0 0.0 0.0
1984 1413 0.0 0.0 0.0
1985 2977 0.0 0.0 0.0
1986 3564 0.0 0.0 0.0
1987 3064 0.0 0.0 0.0
1988 3757 0.0 0.0 0.0
1989 6852 0.0 0.0 0.0
1990 8040 0.0 0.0 0.0
1991 8501 0.0 0.0 0.0
1992 7707 0.0 0.0 0.0
1993 7570 0.0 0.0 0.0
1994 7536 0.0 0.0 0.0
1995 6844 0.0 0.0 0.0
1996 7768 0.0 0.0 0.0
1997 8159 0.0 0.0 0.0
1998 7990 0.0 0.0 0.0
1999 7441 0.0 0.0 0.0
2000 7605 0.0 0.0 0.0
2001 6273 0.0 0.0 0.0
2002 4708 0.0 0.0 0.0
2003 8465 0.0 0.0 0.0
2004 8779 0.0 0.0 0.0
2005 8755 0.0 0.0 0.0
2006 8757 0.0 0.0 0.0
2007 8753 0.0 0.0 0.0
2008 8601 0.0 0.0 0.0
2009 8755 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8748 0.0 0.0 0.0
2012 5745 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-12-28 No Incident Encountered 0.00 0.00
2016-02-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References