X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395030414000

Well Details

Well ID: 0395030414000
Loading map...
Location: 00/14-04-039-03W5/0
Location Alias: 00/14-04-39-03 W5M
Location Alias 2: 00/14-04-039-03 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 04
County/Municipality: Lacombe County
Well Name: ROCK ENERGY MEDR 14-4-39-3
Operator Name: Baytex Energy Ltd.
License Number: 0053586
License Date: 1975-05-15
License Status: Suspension
Spud Date: 1975-05-20
Final Drill Date: 1975-06-08
Well Total Depth: 2235.40 m
Surface Hole Latitude: 52.332583
Surface Hole Longitude: -114.377324

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-05-15 Obtained License
1975-06-08 Finished Drilling
1975-06-08 Well Mode changed to Drilled and Cased
1975-06-09 Drill Stem Test Performed
1975-06-10 Drill Stem Test Performed
1975-06-11 Drill Stem Test Performed
1975-06-12 Drill Stem Test Performed
1975-06-14 Production Casing Operation Performed
1975-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-25 Perforation Treatment Performed - Jet Perforation
1975-06-27 Well Began Production
1975-06-27 Well Fluid changed to Crude Oil
1975-06-27 Well Mode changed to Flowing
1976-01-01 Well Fluid changed to Crude Oil
1976-01-01 Well Mode changed to Suspended
1977-08-06 Well Fluid changed to Crude Oil
1977-08-06 Well Mode changed to Flowing
1985-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-17 Well Fluid changed to Crude Oil
1987-02-17 Well Mode changed to Pumping
2001-06-16 Perforation Treatment Performed - Jet Perforation
2001-06-16 Well Log Performed
2001-06-17 Perforation Treatment Performed - Fractured
2001-06-20 Perforation Treatment Performed - Chemical Squeeze
2001-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-22 Plug Back Performed
2001-06-22 Well Fluid changed to Crude Oil
2001-06-22 Well Log Performed
2001-06-22 Well Mode changed to Abandoned Zone
2001-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-23 Perforation Treatment Performed - Fractured
2001-06-23 Perforation Treatment Performed - Jet Perforation
2001-06-23 Plug Back Performed
2001-06-23 Well Log Performed
2001-06-25 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-06-25 Perforation 2170.20 2178.10 7
2001-06-23 Perforation 1656.50 1659.30 13
2001-06-23 Fracture 1656.50 1659.30 0
2001-06-25 Chemical Squeeze 1656.50 1659.30 0
1975-06-25 Acid Treatment 2170.20 2178.10 0
1985-05-31 Acid Treatment 2170.20 2178.10 0
1986-02-04 Acid Treatment 2170.20 2178.10 0
2001-06-16 Perforation 2105.00 2109.20 13
2001-06-17 Fracture 2105.00 2109.20 0
2001-06-20 Chemical Squeeze 2105.00 2109.20 0
2001-06-22 Packing Device Capped w/Cement 2157.00 2165.00 0
2001-06-23 Packing Device Capped w/Cement 2087.00 2095.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 1416 0.0 0.0 0.0
1977 909 0.0 0.0 0.0
1978 3466 0.0 0.0 0.0
1979 6087 0.0 0.0 0.0
1980 6516 0.0 0.0 0.0
1981 5736 0.0 0.0 0.0
1982 5703 0.0 0.0 0.0
1983 4879 0.0 0.0 0.0
1984 6480 0.0 0.0 0.0
1985 6549 0.0 0.0 0.0
1986 4482 0.0 0.0 0.0
1987 3885 0.0 0.0 0.0
1988 4016 0.0 0.0 0.0
1989 3020 0.0 0.0 0.0
1990 4192 0.0 0.0 0.0
1991 5445 0.0 0.0 0.0
1992 5851 0.0 0.0 0.0
1993 4925 0.0 0.0 0.0
1994 3583 0.0 0.0 0.0
1995 5747 0.0 0.0 0.0
1996 8440 0.0 0.0 0.0
1997 8519 0.0 0.0 0.0
1998 8616 0.0 0.0 0.0
1999 8552 0.0 0.0 0.0
2000 8707 0.0 0.0 0.0
2001 4093 0.0 0.0 0.0

For data sources see[5]

References