X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404182807000

Well Details

Well ID: 0404182807000
Loading map...
Location: 00/07-28-040-18W4/0
Location Alias: 00/07-28-40-18 W4M
Location Alias 2: 00/07-28-040-18 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 18
Section: 28
County/Municipality: County of Stettler No. 6
Well Name: BAYTEX LEAHURST 7-28-40-18
Operator Name: Baytex Energy Ltd.
License Number: 0144134
License Date: 1990-05-11
License Status: Suspension
Spud Date: 1990-05-31
Final Drill Date: 1990-06-05
Well Total Depth: 1326.00 m
Surface Hole Latitude: 52.468904
Surface Hole Longitude: -112.530362

For data sources see[1][2]

Well History

Date Event
1990-05-11 Obtained License
1990-06-01 Surface Casing Operation Performed
1990-06-05 Finished Drilling
1990-06-05 Well Log Performed
1990-06-06 Drill Stem Test Performed
1990-06-07 Production Casing Operation Performed
1990-06-07 Rig Released
1990-06-22 Perforation Treatment Performed - Jet Perforation
1990-06-22 Well Log Performed
1990-06-23 Well Mode changed to Drilled and Cased
1990-10-11 Well Began Production
1990-10-11 Well Fluid changed to Gas
1990-10-11 Well Mode changed to Flowing
1993-06-01 Well Fluid changed to Gas
1993-06-01 Well Mode changed to Suspended
1993-09-25 Well Fluid changed to Gas
1993-09-25 Well Mode changed to Flowing
1995-07-27 Perforation Treatment Performed - Cement Squeeze
1995-07-28 Well Log Performed
1995-07-29 Perforation Treatment Performed - Jet Perforation
1997-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-05 Plug Back Performed
1997-03-06 Perforation Treatment Performed - Jet Perforation
1997-03-14 Well Fluid changed to Gas
1997-03-14 Well Mode changed to Flowing
2000-02-01 Well Fluid changed to Gas
2000-02-01 Well Mode changed to Suspended
2012-08-19 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-06-22 Perforation 1237.00 1238.00 14
1995-07-27 Cement Squeeze 1237.00 1238.00 0
1995-07-29 Perforation 1239.00 1240.40 13
1997-03-05 Packing Device Capped w/Cement 1220.00 1223.00 0
1997-03-06 Perforation 1210.50 1213.00 14
2012-08-19 Perforation 1216.00 1218.00 17
2012-08-19 Perforation 1210.50 1213.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 917 0.0 0.0 0.0
1991 1906 0.0 0.0 0.0
1992 1930 0.0 0.0 0.0
1993 652 0.0 0.0 0.0
1994 1317 0.0 0.0 0.0
1995 107 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References