X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404271013000

Well Details

Well ID: 0404271013000
Loading map...
Location: 00/13-10-040-27W4/0
Location Alias: 00/13-10-40-27 W4M
Location Alias 2: 00/13-10-040-27 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 27
Section: 10
County/Municipality: Lacombe County
Well Name: VERMILION JOFFRE 13-10-40-27
Operator Name: Vermilion Energy Inc.
License Number: 0321094
License Date: 2004-12-07
License Status: Suspension
Spud Date: 2004-12-13
Final Drill Date: 2004-12-18
Well Total Depth: 1013.00 m
Surface Hole Latitude: 52.431286
Surface Hole Longitude: -113.819026

For data sources see[1][2]

Well History

Date Event
2004-12-07 Obtained License
2004-12-13 Surface Casing Operation Performed
2004-12-18 Finished Drilling
2004-12-18 Production Casing Operation Performed
2004-12-18 Rig Released
2004-12-18 Well Mode changed to Drilled and Cased
2004-12-30 Well Log Performed
2005-01-13 Perforation Treatment Performed - Jet Perforation
2005-01-13 Well Log Performed
2005-01-22 Perforation Treatment Performed - Fractured
2005-02-11 Well Log Performed
2005-03-01 Perforation Treatment Performed - Jet Perforation
2005-03-01 Well Log Performed
2005-04-06 Well Began Production
2005-04-06 Well Fluid changed to Coalbed Methane-Coals Only
2005-04-06 Well Mode changed to Flowing
2005-05-22 Well Log Performed
2005-05-26 Perforation Treatment Performed - Fractured
2012-04-01 Well Fluid changed to Coalbed Methane-Coals Only
2012-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-01-13 Perforation 648.50 649.50 14
2005-01-13 Perforation 515.50 516.50 14
2005-01-13 Perforation 511.50 512.50 14
2005-01-13 Perforation 507.50 508.50 14
2005-01-13 Perforation 499.50 500.50 14
2005-01-13 Perforation 432.00 433.00 14
2005-01-13 Perforation 411.00 412.00 14
2005-01-13 Perforation 405.00 406.00 14
2005-01-13 Perforation 399.50 400.50 14
2005-01-22 Fracture 648.50 649.50 0
2005-01-22 Fracture 641.20 642.20 0
2005-01-13 Perforation 641.20 642.20 14
2005-01-22 Fracture 637.00 638.00 0
2005-01-22 Fracture 628.20 629.70 0
2005-01-22 Fracture 617.80 618.80 0
2005-01-22 Fracture 591.30 592.30 0
2005-01-22 Fracture 579.50 580.50 0
2005-01-22 Fracture 553.80 554.80 0
2005-01-22 Fracture 515.50 518.00 0
2005-01-22 Fracture 511.50 512.50 0
2005-01-22 Fracture 507.50 508.50 0
2005-01-22 Fracture 499.50 500.50 0
2005-01-13 Perforation 637.00 638.00 14
2005-01-22 Fracture 432.00 433.00 0
2005-01-22 Fracture 411.00 412.00 0
2005-01-22 Fracture 405.00 406.00 0
2005-01-22 Fracture 399.50 400.50 0
2005-03-01 Perforation 296.00 298.00 17
2005-05-26 Fracture 296.00 298.00 0
2005-01-13 Perforation 628.20 629.70 7
2005-01-13 Perforation 617.80 618.80 14
2005-01-13 Perforation 591.30 592.30 14
2005-01-13 Perforation 579.50 580.50 14
2005-01-13 Perforation 553.80 554.80 14
2005-01-13 Perforation 517.00 518.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 6063 0.0 0.0 0.0
2006 7616 0.0 0.0 0.0
2007 6955 0.0 0.0 0.0
2008 8253 0.0 0.0 0.0
2009 5909 0.0 0.0 0.0
2010 7786 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 1440 0.0 0.0 0.0

For data sources see[5]

References