X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405031714000

Well Details

Well ID: 0405031714000
Loading map...
Location: 00/14-17-040-03W5/0
Location Alias: 00/14-17-40-03 W5M
Location Alias 2: 00/14-17-040-03 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 03
Section: 17
County/Municipality: Lacombe County
Well Name: OMERS ENERGY GILBY 14-17-40-3
Operator Name: Gain Energy Ltd.
License Number: 0022267
License Date: 1962-03-16
License Status: Suspension
Spud Date: 1962-09-05
Final Drill Date: 1962-09-20
Well Total Depth: 2179.90 m
Surface Hole Latitude: 52.447968
Surface Hole Longitude: -114.401363

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-03-16 Obtained License
1962-09-20 Finished Drilling
1962-09-20 Well Mode changed to Drilled and Cased
1962-09-22 Production Casing Operation Performed
1962-10-03 Perforation Treatment Performed - Jet Perforation
1962-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-19 Well Began Production
1962-10-19 Well Fluid changed to Crude Oil
1962-10-19 Well Mode changed to Pumping
1967-02-27 Well Fluid changed to Crude Oil
1967-02-27 Well Mode changed to Suspended
1967-07-21 Well Fluid changed to Crude Oil
1967-07-21 Well Mode changed to Flowing
1972-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-07-24 Perforation Treatment Performed - Fractured
1987-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-27 Perforation Treatment Performed - Jet Perforation
1988-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-16 Well Fluid changed to Crude Oil
1997-06-16 Well Mode changed to Pumping
2014-02-28 Well Fluid changed to Crude Oil
2014-02-28 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-10-03 Perforation 2131.50 2133.90 13
1988-09-29 Acid Treatment 2121.40 2134.20 0
1962-10-04 Acid Treatment 2131.50 2133.90 0
1972-07-24 Acid Treatment 2131.50 2133.90 0
1972-07-24 Fracture 2131.50 2133.90 0
1987-01-22 Acid Treatment 2131.50 2133.90 0
1987-04-03 Acid Treatment 2131.50 2133.90 0
1988-09-27 Perforation 2129.60 2134.20 19
1988-09-27 Perforation 2121.40 2128.40 19
1988-09-27 Perforation 2121.40 2122.00 19

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4399 0.0 0.0 0.0
1968 8127 0.0 0.0 0.0
1969 8010 0.0 0.0 0.0
1970 7846 0.0 0.0 0.0
1971 7680 0.0 0.0 0.0
1972 7070 0.0 0.0 0.0
1973 7802 0.0 0.0 0.0
1974 5463 0.0 0.0 0.0
1976 3697 0.0 0.0 0.0
1977 8388 0.0 0.0 0.0
1978 8179 0.0 0.0 0.0
1979 7871 0.0 0.0 0.0
1980 7870 0.0 0.0 0.0
1981 7755 0.0 0.0 0.0
1982 8112 0.0 0.0 0.0
1983 8161 0.0 0.0 0.0
1984 6948 0.0 0.0 0.0
1985 8348 0.0 0.0 0.0
1986 7586 0.0 0.0 0.0
1987 8099 0.0 0.0 0.0
1988 7266 0.0 0.0 0.0
1989 8093 0.0 0.0 0.0
1990 8079 0.0 0.0 0.0
1991 8390 0.0 0.0 0.0
1992 8695 0.0 0.0 0.0
1993 8236 0.0 0.0 0.0
1994 7907 0.0 0.0 0.0
1995 7947 0.0 0.0 0.0
1996 6732 0.0 0.0 0.0
1997 8397 0.0 0.0 0.0
1998 8301 0.0 0.0 0.0
1999 8038 0.0 0.0 0.0
2000 8281 0.0 0.0 0.0
2001 8407 0.0 0.0 0.0
2002 8514 0.0 0.0 0.0
2003 8027 0.0 0.0 0.0
2004 8361 0.0 0.0 0.0
2005 7880 0.0 0.0 0.0
2006 8313 0.0 0.0 0.0
2007 8259 0.0 0.0 0.0
2008 8354 0.0 0.0 0.0
2009 8354 0.0 0.0 0.0
2010 8636 0.0 0.0 0.0
2011 8513 0.0 0.0 0.0
2012 2392 0.0 0.0 0.0

For data sources see[5]

References