X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405031902000

Well Details

Well ID: 0405031902000
Loading map...
Location: 00/02-19-040-03W5/0
Location Alias: 00/02-19-40-03 W5M
Location Alias 2: 00/02-19-040-03 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 03
Section: 19
County/Municipality: Lacombe County
Well Name: AECOG(W) GILBY 2-19-40-3
Operator Name: Gain Energy Ltd.
License Number: 0023022
License Date: 1962-09-19
License Status: Suspension
Spud Date: 1962-09-22
Final Drill Date: 1962-10-02
Well Total Depth: 2151.00 m
Surface Hole Latitude: 52.452018
Surface Hole Longitude: -114.418708

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-09-19 Obtained License
1962-10-02 Finished Drilling
1962-10-02 Well Mode changed to Drilled and Cased
1962-10-04 Production Casing Operation Performed
1962-10-12 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-22 Well Began Production
1962-10-22 Well Fluid changed to Crude Oil
1962-10-22 Well Mode changed to Pumping
1971-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-02 Perforation Treatment Performed - Fractured
1982-05-17 Well Began Injection
1982-05-17 Well Fluid changed to Water
1982-05-17 Well Type changed to Disposal
1992-06-02 Perforation Treatment Performed - Chemical Squeeze
1992-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-06-02 Well Fluid changed to Water
2010-06-02 Well Type changed to Injection
2014-02-28 Well Fluid changed to Water
2014-02-28 Well Mode changed to Suspended
2014-02-28 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-10-12 Hydra Jet Perforation 2145.20 2145.50 0
1962-10-12 Acid Treatment 2145.20 2150.10 0
1971-02-02 Acid Treatment 2145.20 2150.10 0
1971-02-02 Fracture 2145.20 2150.10 0
1992-06-02 Chemical Squeeze 2145.20 2150.10 0
1992-06-03 Acid Treatment 2145.20 2150.10 0
1962-10-12 Hydra Jet Perforation 2145.80 2146.10 0
1962-10-12 Hydra Jet Perforation 2146.40 2146.70 0
1962-10-12 Hydra Jet Perforation 2147.00 2147.30 0
1962-10-12 Hydra Jet Perforation 2147.60 2147.90 0
1962-10-12 Hydra Jet Perforation 2148.20 2148.50 0
1962-10-12 Hydra Jet Perforation 2148.80 2149.10 0
1962-10-12 Hydra Jet Perforation 2149.40 2149.80 0
1962-10-12 Hydra Jet Perforation 2150.10 2150.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8358 0.0 0.0 0.0
1968 8233 0.0 0.0 0.0
1969 8307 0.0 0.0 0.0
1970 8106 0.0 0.0 0.0
1971 8137 0.0 0.0 0.0
1972 8186 0.0 0.0 0.0
1973 8334 0.0 0.0 0.0
1974 7087 0.0 0.0 0.0
1975 7994 0.0 0.0 0.0
1976 7353 0.0 0.0 0.0
1977 8093 0.0 0.0 0.0
1978 382 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0

For data sources see[5]

References