X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405031906000

Well Details

Well ID: 0405031906000
Loading map...
Location: 00/06-19-040-03W5/0
Location Alias: 00/06-19-40-03 W5M
Location Alias 2: 00/06-19-040-03 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 03
Section: 19
County/Municipality: Lacombe County
Well Name: OMERS ENERGY GILBY 6-19-40-3
Operator Name: Gain Energy Ltd.
License Number: 0019878
License Date: 1960-10-24
License Status: Issued
Spud Date: 1960-10-30
Final Drill Date: 1960-11-17
Well Total Depth: 2209.80 m
Surface Hole Latitude: 52.455911
Surface Hole Longitude: -114.424419

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-10-24 Obtained License
1960-11-16 Drill Stem Test Performed
1960-11-17 Drill Stem Test Performed
1960-11-17 Finished Drilling
1960-11-17 Well Mode changed to Drilled and Cased
1960-11-19 Production Casing Operation Performed
1960-11-22 Perforation Treatment Performed - Jet Perforation
1960-11-24 Perforation Treatment Performed - Acid Wash - No Pressure
1960-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-11-27 Perforation Treatment Performed - Jet Perforation
1960-12-03 Well Began Production
1960-12-03 Well Fluid changed to Crude Oil
1960-12-03 Well Mode changed to Pumping
1960-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-01-05 Perforation Treatment Performed - Jet Perforation
1961-01-06 Perforation Treatment Performed - Acid Wash - No Pressure
1961-01-08 Perforation Treatment Performed - Cement Squeeze
1961-01-15 Perforation Treatment Performed - Bullet Perforation
1961-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-01-17 Perforation Treatment Performed - Jet Perforation
1962-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-04 Perforation Treatment Performed - Fractured
1962-08-03 Perforation Treatment Performed - Cement Squeeze
1962-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-08-06 Perforation Treatment Performed - Jet Perforation
1962-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-08-07 Perforation Treatment Performed - Jet Perforation
1971-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-03 Perforation Treatment Performed - Fractured
1990-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-11-22 Perforation 2169.30 2171.40 13
1961-01-15 Bullet Perforation 2150.40 2151.00 13
1961-01-17 Perforation 2161.00 2164.10 13
1961-01-17 Acid Treatment 2150.40 2164.10 0
1962-03-04 Acid Treatment 2150.40 2164.10 0
1962-03-04 Fracture 2150.40 2164.10 0
1962-08-03 Cement Squeeze 2150.40 2164.10 0
1962-08-06 Perforation 2159.50 2164.10 13
1962-08-06 Acid Treatment 2159.50 2164.10 0
1962-08-07 Perforation 2159.50 2164.10 13
1962-08-07 Acid Treatment 2159.50 2164.10 0
1960-11-24 Acid Wash 2169.30 2171.40 0
1971-02-03 Acid Treatment 2159.50 2164.10 0
1971-02-03 Fracture 2159.50 2164.10 0
1990-09-23 Acid Treatment 2159.50 2164.10 0
1960-11-25 Acid Treatment 2169.30 2171.40 0
1960-11-27 Packing Device Capped w/Cement 2167.70 2167.70 0
1960-11-27 Perforation 2159.50 2165.60 13
1960-12-23 Acid Treatment 2159.50 2165.60 0
1961-01-05 Perforation 2161.00 2164.10 13
1961-01-06 Acid Wash 2159.50 2165.60 0
1961-01-08 Cement Squeeze 2159.50 2165.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7604 0.0 0.0 0.0
1968 8481 0.0 0.0 0.0
1969 8365 0.0 0.0 0.0
1970 6944 0.0 0.0 0.0
1971 7806 0.0 0.0 0.0
1972 7570 0.0 0.0 0.0
1973 7686 0.0 0.0 0.0
1974 5669 0.0 0.0 0.0
1975 7849 0.0 0.0 0.0
1976 7056 0.0 0.0 0.0
1977 8207 0.0 0.0 0.0
1978 6557 0.0 0.0 0.0
1979 7740 0.0 0.0 0.0
1980 7697 0.0 0.0 0.0
1981 4739 0.0 0.0 0.0
1982 6944 0.0 0.0 0.0
1983 6778 0.0 0.0 0.0
1984 7295 0.0 0.0 0.0
1985 7216 0.0 0.0 0.0
1986 7993 0.0 0.0 0.0
1987 8477 0.0 0.0 0.0
1988 8349 0.0 0.0 0.0
1989 7573 0.0 0.0 0.0
1990 8095 0.0 0.0 0.0
1991 8326 0.0 0.0 0.0
1992 8717 0.0 0.0 0.0
1993 7695 0.0 0.0 0.0
1994 8477 0.0 0.0 0.0
1995 8285 0.0 0.0 0.0
1996 7051 0.0 0.0 0.0
1997 8370 0.0 0.0 0.0
1998 8414 0.0 0.0 0.0
1999 8268 0.0 0.0 0.0
2000 8464 0.0 0.0 0.0
2001 8125 0.0 0.0 0.0
2002 8001 0.0 0.0 0.0
2003 8458 0.0 0.0 0.0
2004 8660 0.0 0.0 0.0
2005 8470 0.0 0.0 0.0
2006 8325 0.0 0.0 0.0
2007 8454 0.0 0.0 0.0
2008 8427 0.0 0.0 0.0
2009 8404 0.0 0.0 0.0
2010 8706 0.0 0.0 0.0
2011 8256 0.0 0.0 0.0
2012 7877 0.0 0.0 0.0
2013 8623 0.0 0.0 0.0
2014 8190 0.0 0.0 0.0
2015 8718 0.0 0.0 0.0
2016 4782 0.0 0.0 0.0
2017 752 0.0 0.0 0.0
2018 2877 0.0 0.0 0.0
2019 5070 0.0 0.0 0.0
2020 408 0.0 0.0 0.0

For data sources see[5]

References