X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405041012000

Well Details

Well ID: 0405041012000
Loading map...
Location: 00/12-10-040-04W5/0
Location Alias: 00/12-10-40-04 W5M
Location Alias 2: 00/12-10-040-04 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 04
Section: 10
County/Municipality: Clearwater County
Well Name: OEI GILBY 12-10-40-4
Operator Name: Gain Energy Ltd.
License Number: 0027441
License Date: 1964-12-29
License Status: Abandoned
Spud Date: 1965-01-02
Final Drill Date: 1965-02-13
Well Total Depth: 2349.40 m
Surface Hole Latitude: 52.430125
Surface Hole Longitude: -114.502775

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-12-29 Obtained License
1965-01-02 Lost Circulation Occurred
1965-01-06 Blowout Occurred
1965-01-14 Blowout Occurred
1965-01-24 Drill Stem Test Performed
1965-01-25 Drill Stem Test Performed
1965-01-29 Drill Stem Test Performed
1965-02-07 Drill Stem Test Performed
1965-02-09 Drill Stem Test Performed
1965-02-13 Finished Drilling
1965-02-13 Well Mode changed to Drilled and Cased
1965-02-14 Drill Stem Test Performed
1965-02-15 Production Casing Operation Performed
1965-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-03 Perforation Treatment Performed - Acid Wash - No Pressure
1965-03-03 Perforation Treatment Performed - Bullet Perforation
1965-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-04 Perforation Treatment Performed - Bullet Perforation
1965-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-03-19 Perforation Treatment Performed - Jet Perforation
1965-03-20 Well Began Production
1965-03-20 Well Fluid changed to Crude Oil
1965-03-20 Well Mode changed to Flowing
1965-07-29 Perforation Treatment Performed - Jet Perforation
1965-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-07-31 Perforation Treatment Performed - Fractured
1988-10-20 Well Fluid changed to Crude Oil
1988-10-20 Well Mode changed to Suspended
1992-06-19 Perforation Treatment Performed - Cement Squeeze
1992-06-19 Plug Back Performed
1992-06-19 Well Fluid changed to Crude Oil
1992-06-19 Well Mode changed to Abandoned Zone
1992-09-16 Perforation Treatment Performed - Jet Perforation
1992-09-16 Well Fluid changed to Crude Oil
1992-09-16 Well Mode changed to Suspended
1999-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-30 Plug Back Performed
1999-08-30 Well Log Performed
1999-09-01 Well Log Performed
1999-09-02 Well Log Performed
1999-09-09 Perforation Treatment Performed - Cement Plug
2000-06-02 Perforation Treatment Performed - Jet Perforation
2000-06-04 Perforation Treatment Performed - Remedial Casing
2000-07-19 Well Abandoned
2000-07-19 Well Fluid changed to Crude Oil
2000-07-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-03-03 Bullet Perforation 2233.90 2234.80 7
1965-07-29 Perforation 2051.60 2052.20 7
1965-07-30 Acid Treatment 2048.30 2052.20 0
1965-07-31 Fracture 2048.30 2052.20 0
1992-06-19 Cement Squeeze 2048.30 2052.20 0
1992-09-16 Perforation 2239.70 2242.70 7
1999-08-30 Packing Device Capped w/Cement 2212.00 2220.00 0
1999-09-09 Cement Plug 551.00 952.40 0
2000-06-02 Perforation 440.00 445.00 17
2000-06-04 Remedial Casing Cementing 440.00 445.00 0
1965-03-03 Acid Wash 2233.90 2234.80 0
1965-03-03 Acid Treatment 2233.90 2234.80 0
1965-03-04 Bullet Perforation 2239.70 2242.70 7
1965-03-04 Acid Treatment 2239.70 2242.70 0
1965-03-18 Packing Device Capped w/Cement 2095.50 2095.50 0
1965-03-19 Perforation 2048.30 2049.50 7
1965-03-19 Perforation 2051.30 2051.90 7
1965-07-29 Perforation 2049.50 2050.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1464 0.0 0.0 0.0
1969 6047 0.0 0.0 0.0
1970 2714 0.0 0.0 0.0
1971 2628 0.0 0.0 0.0
1972 5222 0.0 0.0 0.0
1973 8709 0.0 0.0 0.0
1974 8735 0.0 0.0 0.0
1975 7787 0.0 0.0 0.0
1976 7988 0.0 0.0 0.0
1977 7165 0.0 0.0 0.0
1978 8759 0.0 0.0 0.0
1979 7135 0.0 0.0 0.0
1980 5536 0.0 0.0 0.0
1981 5249 0.0 0.0 0.0
1982 3130 0.0 0.0 0.0
1983 3706 0.0 0.0 0.0
1985 72 0.0 0.0 0.0
1988 5530 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1965-01-14 Blowout 1790.60 1790.60
1965-01-02 Lost Circulation 91.40 234.70
1965-01-06 Blowout 1761.70 1761.70

For data sources see[6]

References