X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414211311000

Well Details

Well ID: 0414211311000
Loading map...
Location: 00/11-13-041-21W4/0
Location Alias: 00/11-13-41-21 W4M
Location Alias 2: 00/11-13-041-21 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 21
Section: 13
County/Municipality: Camrose County
Well Name: TEAC BASHAW 11-13-41-21
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0021573
License Date: 1961-10-23
License Status: Abandoned
Spud Date: 1961-10-23
Final Drill Date: 1961-11-06
Well Total Depth: 1802.30 m
Surface Hole Latitude: 52.530915
Surface Hole Longitude: -112.898870

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-10-23 Obtained License
1961-10-29 Drill Stem Test Performed
1961-11-02 Drill Stem Test Performed
1961-11-06 Finished Drilling
1961-11-07 Drill Stem Test Performed
1961-11-08 Production Casing Operation Performed
1961-12-05 Well Mode changed to Drilled and Cased
1975-08-19 Perforation Treatment Performed - Jet Perforation
1977-06-01 Well Began Production
1977-06-01 Well Fluid changed to Gas
1977-06-01 Well Mode changed to Flowing
2004-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-14 Plug Back Performed
2004-09-14 Well Fluid changed to Gas
2004-09-14 Well Mode changed to Abandoned Zone
2004-09-17 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-17 Perforation Treatment Performed - Remedial Casing
2004-09-18 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-09-19 Perforation Treatment Performed - Cement Plug
2004-09-19 Perforation Treatment Performed - Remedial Casing
2004-10-01 Well Abandoned
2004-10-01 Well Fluid changed to Gas
2004-10-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-08-19 Perforation 1117.00 1118.60 13
2004-09-14 Packing Device Capped w/Cement 499.60 1103.50 0
2004-09-17 Hydra Jet Perforation 263.50 264.00 1
2004-09-17 Remedial Casing Cementing 263.50 264.00 0
2004-09-17 Packing Device Capped w/Cement 245.00 261.00 0
2004-09-18 Hydra Jet Perforation 244.50 245.10 1
2004-09-19 Remedial Casing Cementing 244.50 245.00 0
2004-09-19 Cement Plug 164.50 244.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 2277 0.0 0.0 0.0
1978 6171 0.0 0.0 0.0
1979 2904 0.0 0.0 0.0
1980 3088 0.0 0.0 0.0
1981 3528 0.0 0.0 0.0
1982 3441 0.0 0.0 0.0
1983 2313 0.0 0.0 0.0
1984 3379 0.0 0.0 0.0
1985 3324 0.0 0.0 0.0
1986 3313 0.0 0.0 0.0
1987 2341 0.0 0.0 0.0
1988 2796 0.0 0.0 0.0
1989 3620 0.0 0.0 0.0
1990 2090 0.0 0.0 0.0
1991 8238 0.0 0.0 0.0
1992 8312 0.0 0.0 0.0
1993 8349 0.0 0.0 0.0
1994 8336 0.0 0.0 0.0
1995 8734 0.0 0.0 0.0
1996 8399 0.0 0.0 0.0
1997 8044 0.0 0.0 0.0
1998 8020 0.0 0.0 0.0
1999 5661 0.0 0.0 0.0

For data sources see[5]

References