X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414213312000

Well Details

Well ID: 0414213312000
Loading map...
Location: 00/12-33-041-21W4/0
Location Alias: 00/12-33-41-21 W4M
Location Alias 2: 00/12-33-041-21 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 21
Section: 33
County/Municipality: Camrose County
Well Name: EMBER BASHAW 12-33-41-21
Operator Name: Ember Resources Inc.
License Number: 0402614
License Date: 2008-10-22
License Status: Issued
Spud Date: 2009-02-11
Final Drill Date: 2009-02-12
Well Total Depth: 929.00 m
Surface Hole Latitude: 52.577124
Surface Hole Longitude: -112.980733

For data sources see[1][2]

Well History

Date Event
2008-10-22 Obtained License
2009-02-11 Direction Drilling Operation Performed - Deviate
2009-02-11 Surface Casing Operation Performed
2009-02-12 Finished Drilling
2009-02-12 Well Log Performed
2009-02-12 Well Mode changed to Drilled and Cased
2009-02-13 Production Casing Operation Performed
2009-02-13 Rig Released
2009-02-21 Perforation Treatment Performed - Jet Perforation
2009-02-21 Well Log Performed
2009-02-23 Perforation Treatment Performed - Jet Perforation
2009-02-26 Perforation Treatment Performed - Fractured
2009-03-01 Well Fluid changed to Coalbed Methane-Coals and Other
2009-03-01 Well Mode changed to Testing
2009-03-07 Well Began Production
2009-03-07 Well Fluid changed to Coalbed Methane-Coals and Other
2009-03-07 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-02-11 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-21 Perforation 367.00 371.00 13
2009-02-23 Perforation 353.90 354.40 13
2009-02-23 Perforation 415.00 416.00 13
2009-02-23 Perforation 355.60 356.60 13
2009-02-23 Perforation 384.10 387.10 13
2009-02-23 Perforation 380.10 384.10 13
2009-02-23 Perforation 333.50 334.00 13
2009-02-23 Perforation 341.10 342.60 13
2009-02-23 Perforation 343.80 344.80 13
2009-02-26 Fracture 377.00 378.50 0
2009-02-26 Fracture 392.00 393.00 0
2009-02-21 Perforation 377.00 378.50 13
2009-02-26 Fracture 321.00 323.00 0
2009-02-26 Fracture 367.00 375.00 0
2009-02-26 Fracture 380.10 387.10 0
2009-02-26 Fracture 415.00 416.00 0
2009-02-26 Fracture 302.00 313.10 0
2009-02-26 Fracture 327.00 356.60 0
2009-02-21 Perforation 371.00 375.00 13
2009-02-23 Perforation 312.60 313.10 13
2009-02-23 Perforation 310.00 310.50 13
2009-02-23 Perforation 302.00 302.50 13
2009-02-23 Perforation 392.00 393.00 13
2009-02-23 Perforation 321.00 323.00 13
2009-02-23 Perforation 327.00 328.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6908 0.0 0.0 0.0
2010 8751 0.0 0.0 0.0
2011 8750 0.0 0.0 0.0
2012 8778 0.0 0.0 0.0
2013 8732 0.0 0.0 0.0
2014 8754 0.0 0.0 0.0
2015 8753 0.0 0.0 0.0
2016 8772 0.0 0.0 0.0
2017 8749 0.0 0.0 0.0
2018 8730 0.0 0.0 0.0
2019 8752 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[6]

References