X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414223507020

Well Details

Well ID: 0414223507020
Loading map...
Location: 02/07-35-041-22W4/0
Location Alias: 02/07-35-41-22 W4M
Location Alias 2: 02/07-35-041-22 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 22
Section: 35
County/Municipality: Camrose County
Well Name: EMBER 102 BASHAW 7-35-41-22
Operator Name: Ember Resources Inc.
License Number: 0421410
License Date: 2010-06-25
License Status: Issued
Spud Date: 2010-11-14
Final Drill Date: 2010-11-21
Well Total Depth: 688.00 m
Surface Hole Latitude: 52.569825
Surface Hole Longitude: -113.058634

For data sources see[1][2]

Well History

Date Event
2010-06-25 Obtained License
2010-11-15 Surface Casing Operation Performed
2010-11-21 Finished Drilling
2010-11-21 Production Casing Operation Performed
2010-11-21 Rig Released
2010-11-21 Well Mode changed to Drilled and Cased
2010-11-28 Well Log Performed
2010-12-14 Perforation Treatment Performed - Jet Perforation
2010-12-14 Well Fluid changed to Gas
2010-12-14 Well Mode changed to Testing
2010-12-22 Well Began Production
2010-12-22 Well Fluid changed to Gas
2010-12-22 Well Mode changed to Flowing
2011-01-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-04 Plug Back Performed
2011-01-04 Well Fluid changed to Gas
2011-01-04 Well Mode changed to Abandoned Zone
2011-01-25 Perforation Treatment Performed - Jet Perforation
2011-01-27 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-14 Perforation 660.00 663.00 13
2011-01-25 Perforation 195.50 197.00 13
2011-01-25 Perforation 222.50 225.00 13
2011-01-25 Perforation 210.50 212.00 13
2011-01-25 Perforation 203.00 205.00 13
2011-01-25 Perforation 186.90 187.90 13
2011-01-25 Perforation 184.50 186.00 13
2011-01-25 Perforation 309.50 311.50 13
2011-01-25 Perforation 352.50 354.00 13
2011-01-25 Perforation 339.50 341.00 13
2011-01-25 Perforation 334.50 335.50 13
2010-12-14 Perforation 660.00 663.00 13
2011-01-25 Perforation 426.90 427.90 13
2011-01-25 Perforation 394.00 398.00 13
2011-01-25 Perforation 358.90 359.90 13
2011-01-25 Perforation 302.50 305.50 13
2011-01-25 Perforation 305.50 308.00 13
2011-01-25 Perforation 268.20 269.20 13
2011-01-25 Perforation 277.50 279.00 13
2011-01-25 Perforation 322.80 324.30 13
2011-01-25 Perforation 308.50 309.50 13
2011-01-27 Fracture 203.00 311.50 0
2011-01-04 Packing Device Capped w/Cement 647.00 655.00 0
2011-01-27 Fracture 352.50 359.90 0
2011-01-27 Fracture 238.00 341.00 0
2011-01-25 Perforation 253.70 256.20 13
2011-01-25 Perforation 241.50 242.50 13
2011-01-25 Perforation 238.00 240.50 13
2011-01-25 Perforation 264.20 265.20 13
2011-01-25 Perforation 260.50 262.00 13
2011-01-25 Perforation 258.50 260.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 192 0.0 0.0 0.0

For data sources see[5]

References