X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414271910020

Well Details

Well ID: 0414271910020
Loading map...
Location: 02/10-19-041-27W4/0
Location Alias: 02/10-19-41-27 W4M
Location Alias 2: 02/10-19-041-27 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 27
Section: 19
County/Municipality: Lacombe County
Well Name: ESSO GULL LAKE A10-19-41-27
Operator Name: Imperial Oil Resources Limited
License Number: 0049227
License Date: 1974-03-04
License Status: RecCertified
Spud Date: 1974-02-25
Final Drill Date: 1974-03-16
Well Total Depth: 1877.60 m
Surface Hole Latitude: 52.545693
Surface Hole Longitude: -113.874752

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-03-04 Obtained License
1974-03-16 Finished Drilling
1974-03-16 Well Mode changed to Drilled and Cased
1974-03-18 Drill Stem Test Performed
1974-03-19 Drill Stem Test Performed
1974-03-21 Drill Stem Test Performed
1974-03-22 Drill Stem Test Performed
1974-03-24 Production Casing Operation Performed
1974-04-01 Perforation Treatment Performed - Jet Perforation
1974-04-04 Well Began Production
1974-04-04 Well Fluid changed to Crude Oil
1974-04-04 Well Mode changed to Flowing
1974-06-15 Well Fluid changed to Crude Oil
1974-06-15 Well Mode changed to Pumping
1974-07-31 Perforation Treatment Performed - Jet Perforation
1974-08-01 Perforation Treatment Performed - Cement Squeeze
1974-08-03 Perforation Treatment Performed - Cement Squeeze
1980-10-01 Well Fluid changed to Crude Oil
1980-10-01 Well Mode changed to Suspended
1982-09-21 Well Fluid changed to Crude Oil
1982-09-21 Well Mode changed to Flowing
1985-08-01 Well Fluid changed to Crude Oil
1985-08-01 Well Mode changed to Suspended
1992-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-19 Perforation Treatment Performed - Jet Perforation
1992-07-19 Perforation Treatment Performed - Remedial Casing
1992-07-19 Plug Back Performed
1992-07-19 Well Fluid changed to Crude Oil
1992-07-19 Well Log Performed
1992-07-19 Well Mode changed to Abandoned
1992-07-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-04-01 Perforation 1800.80 1803.80 13
1974-07-31 Perforation 1039.40 1040.60 7
1974-08-01 Cement Squeeze 1039.40 1040.60 0
1974-08-03 Cement Squeeze 1039.40 1040.60 0
1992-07-19 Packing Device Capped w/Cement 1009.00 1017.00 0
1992-07-19 Perforation 293.00 294.00 13
1992-07-19 Remedial Casing Cementing 293.00 294.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 4411 0.0 0.0 0.0
1975 6716 0.0 0.0 0.0
1976 6752 0.0 0.0 0.0
1977 8477 0.0 0.0 0.0
1978 8051 0.0 0.0 0.0
1979 7859 0.0 0.0 0.0
1980 4793 0.0 0.0 0.0
1982 1654 0.0 0.0 0.0
1983 5689 0.0 0.0 0.0
1984 8023 0.0 0.0 0.0
1985 1911 0.0 0.0 0.0

For data sources see[5]

References