X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414271910030

Well Details

Well ID: 0414271910030
Loading map...
Location: 03/10-19-041-27W4/0
Location Alias: 03/10-19-41-27 W4M
Location Alias 2: 03/10-19-041-27 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 27
Section: 19
County/Municipality: Ponoka County
Well Name: BEC HZ MORNSIDE 10-19-41-27
Operator Name: Bonavista Energy Corporation
License Number: 0488854
License Date: 2018-04-18
License Status: Amended
Spud Date: 2018-05-02
Final Drill Date: 2018-05-11
Well Total Depth: 5904.00 m
Surface Hole Latitude: 52.580487
Surface Hole Longitude: -113.873165

For data sources see[1][2]

Well History

Date Event
2018-04-18 Obtained License
2018-05-02 Surface Casing Operation Performed
2018-05-03 Direction Drilling Operation Performed - Deviate
2018-05-05 Direction Drilling Operation Performed - Horizontal
2018-05-05 Well Log Performed
2018-05-06 Intermediate Casing Operation Performed
2018-05-11 Finished Drilling
2018-05-11 Well Log Performed
2018-05-11 Well Mode changed to Drilled and Cased
2018-05-14 Liner Casing Operation Performed
2018-05-15 Perforation Treatment Performed - Open-Hole Completion
2018-05-15 Rig Released
2018-05-23 Well Log Performed
2018-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-01 Well Fluid changed to Gas
2018-06-01 Well Mode changed to Testing
2018-06-19 Well Began Production
2018-06-19 Well Fluid changed to Gas
2018-06-19 Well Mode changed to Flowing
2019-09-01 Well Fluid changed to Gas
2019-09-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-05-03 493.50 Deviate (5 - 79 degrees)
2018-05-05 1840.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-05-15 Open Hole/Barefoot Completion 5898.00 5904.00 0
2018-05-29 Multi-Stage Fracture 4949.80 4949.90 0
2018-05-29 Multi-Stage Fracture 4834.30 4834.40 0
2018-05-29 Multi-Stage Fracture 4704.30 4704.40 0
2018-05-29 Multi-Stage Fracture 4589.40 4589.50 0
2018-05-29 Multi-Stage Fracture 4472.60 4472.70 0
2018-05-29 Multi-Stage Fracture 4355.90 4356.00 0
2018-05-29 Multi-Stage Fracture 4226.80 4226.90 0
2018-05-29 Multi-Stage Fracture 4111.30 4111.40 0
2018-05-29 Multi-Stage Fracture 3994.10 3994.20 0
2018-05-29 Multi-Stage Fracture 3878.70 3878.80 0
2018-05-29 Multi-Stage Fracture 5875.80 5875.90 0
2018-05-30 Multi-Stage Fracture 3747.80 3747.90 0
2018-05-30 Multi-Stage Fracture 3630.60 3630.70 0
2018-05-30 Multi-Stage Fracture 3511.80 3511.90 0
2018-05-30 Multi-Stage Fracture 3392.20 3392.30 0
2018-05-30 Multi-Stage Fracture 3272.20 3272.30 0
2018-05-30 Multi-Stage Fracture 3150.20 3150.30 0
2018-05-30 Multi-Stage Fracture 3034.50 3034.60 0
2018-05-30 Multi-Stage Fracture 2913.60 2913.70 0
2018-05-30 Multi-Stage Fracture 2793.20 2793.30 0
2018-05-30 Multi-Stage Fracture 2685.60 2685.70 0
2018-05-29 Multi-Stage Fracture 5782.10 5782.20 0
2018-05-30 Multi-Stage Fracture 2564.90 2565.00 0
2018-05-31 Multi-Stage Fracture 2445.10 2445.20 0
2018-05-31 Multi-Stage Fracture 2323.60 2323.70 0
2018-05-31 Multi-Stage Fracture 2203.50 2203.60 0
2018-05-31 Multi-Stage Fracture 2085.60 2085.70 0
2018-05-31 Multi-Stage Fracture 1968.90 1969.00 0
2018-05-29 Multi-Stage Fracture 5665.10 5665.20 0
2018-05-29 Multi-Stage Fracture 5548.50 5548.60 0
2018-05-29 Multi-Stage Fracture 5431.80 5431.90 0
2018-05-29 Multi-Stage Fracture 5301.40 5301.50 0
2018-05-29 Multi-Stage Fracture 5184.20 5184.30 0
2018-05-29 Multi-Stage Fracture 5068.20 5068.30 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-29 2018-05-31 1,769 1,806 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 51.7636 N/A
Water 7732-18-5 100 25.5323 N/A
20/40 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 22.0418 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0047 N/A
Methyl Alcohol 67-56-1 100 0.0047 N/A
Non-Hazardous Ingredients Not Available 100 0.0047 N/A
SVB-1 (Viscoelastic Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0533 N/A
SBL-2 (Buffer) Step Energy Services Buffer Acetic Acid 64-19-7 100 0.0525 N/A
Non-Hazardous Ingredients Not Available 100 0.0525 N/A
SVS-1 (Viscoelastic Surfactant) Step Energy Services Surfactant Proprietary Trade Secret 100 0.5515 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4843 0.0 0.0 0.0
2019 8251 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-05-11 No Incident Encountered 0.00 0.00
2018-06-13 No Incident Encountered 0.00 0.00

For data sources see[8]

References