X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415023316002

Well Details

Well ID: 0415023316002
Loading map...
Location: 00/16-33-041-02W5/2
Location Alias: 00/16-33-41-02 W5M
Location Alias 2: 00/16-33-041-02 W5/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 02
Section: 33
County/Municipality: Ponoka County
Well Name: JOURNEY GILBY 16-33-41-2
Operator Name: Journey Energy Inc.
License Number: 0114573
License Date: 1985-05-13
License Status: Issued
Spud Date: 1985-06-12
Final Drill Date: 1985-07-06
Well Total Depth: 2490.00 m
Surface Hole Latitude: 52.578359
Surface Hole Longitude: -114.222163

For data sources see[1][2]

Well History

Date Event
1985-05-13 Obtained License
1985-06-14 Surface Casing Operation Performed
1985-06-28 Well Log Performed
1985-06-29 Intermediate Casing Operation Performed
1985-07-01 Direction Drilling Operation Performed - Deviate
1985-07-06 Finished Drilling
1985-07-06 Well Mode changed to Drilled and Cased
1985-07-07 Well Log Performed
1985-07-08 Liner Casing Operation Performed
1985-07-08 Rig Released
1985-10-20 Well Log Performed
1985-10-22 Perforation Treatment Performed - Jet Perforation
1985-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-30 Well Log Performed
1985-11-01 Perforation Treatment Performed - Cement Squeeze
1985-11-05 Well Log Performed
1985-11-06 Perforation Treatment Performed - Jet Perforation
1985-11-08 Well Log Performed
1985-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-11-09 Plug Back Performed
1986-07-07 Well Log Performed
1986-07-10 Perforation Treatment Performed - Jet Perforation
1986-07-14 Perforation Treatment Performed - Acid Wash - No Pressure
1986-07-22 Perforation Treatment Performed - Fractured
1986-07-24 Perforation Treatment Performed - Jet Perforation
1986-07-24 Well Log Performed
1986-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-06-14 Well Log Performed
2004-06-16 Well Log Performed
2004-06-17 Perforation Treatment Performed - Jet Perforation
2004-06-20 Perforation Treatment Performed - Fractured
2004-10-01 Well Began Production
2004-10-01 Well Fluid changed to Gas
2004-10-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-07-01 2260.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-10-22 Perforation 2431.50 2432.50 13
1986-07-24 Perforation 1927.00 1930.00 13
1986-07-29 Acid Treatment 1922.00 1930.00 0
2004-06-05 Acid Treatment 1922.00 1944.50 0
2004-06-17 Perforation 1883.00 1885.00 17
2004-06-20 Fracture 1883.00 1885.00 0
1985-10-24 Acid Treatment 2431.50 2432.50 0
1985-11-01 Cement Squeeze 2431.50 2432.50 0
1985-11-06 Perforation 2431.50 2432.00 13
1985-11-09 Packing Device Capped w/Cement 2412.00 2420.00 0
1986-07-10 Perforation 1936.50 1944.50 13
1986-07-14 Acid Wash 1936.50 1944.50 0
1986-07-22 Fracture 1936.50 1944.50 0
1986-07-24 Perforation 1922.00 1926.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 7890 0.0 0.0 0.0
2006 8712 0.0 0.0 0.0
2007 8689 0.0 0.0 0.0
2008 8772 0.0 0.0 0.0
2009 8602 0.0 0.0 0.0
2010 8156 0.0 0.0 0.0
2011 4698 0.0 0.0 0.0
2012 8345 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8355 0.0 0.0 0.0
2018 8267 0.0 0.0 0.0
2019 8140 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References