If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415050308000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.500718,"lon":-114.627624,"icon":""}]} |
Location: 00/08-03-041-05W5/0 | |
Location Alias: 00/08-03-41-05 W5M | |
Location Alias 2: 00/08-03-041-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 05 | |
Section: 03 | |
County/Municipality: Clearwater County | |
Well Name: ESSO ET AL WILLGR 8-3-41-5 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0123376 | |
License Date: 1986-06-27 | |
License Status: RecCertified | |
Spud Date: 1986-07-25 | |
Final Drill Date: 1986-07-31 | |
Well Total Depth: 1916.00 m | |
Surface Hole Latitude: 52.500718 | |
Surface Hole Longitude: -114.627624 |
Date | Event |
---|---|
1986-06-27 | Obtained License |
1986-07-26 | Surface Casing Operation Performed |
1986-07-31 | Finished Drilling |
1986-07-31 | Well Mode changed to Drilled and Cased |
1986-08-01 | Well Log Performed |
1986-08-02 | Production Casing Operation Performed |
1986-08-02 | Well Log Performed |
1986-08-03 | Rig Released |
1986-09-10 | Perforation Treatment Performed - Jet Perforation |
1986-09-10 | Well Log Performed |
1986-09-16 | Well Began Production |
1986-09-16 | Well Fluid changed to Crude Oil |
1986-09-16 | Well Mode changed to Pumping |
1986-09-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-11-17 | Perforation Treatment Performed - Fractured |
1991-09-26 | Well Fluid changed to Crude Oil |
1991-09-26 | Well Mode changed to Suspended |
1996-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-02-27 | Perforation Treatment Performed - Jet Perforation |
1996-02-27 | Plug Back Performed |
1996-02-27 | Well Log Performed |
1996-05-01 | Perforation Treatment Performed - Remedial Casing |
1996-05-17 | Well Abandoned |
1996-05-17 | Well Fluid changed to Crude Oil |
1996-05-17 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-09-10 | Perforation | 1878.50 | 1881.50 | 7 |
1986-09-17 | Acid Treatment | 1878.50 | 1881.50 | 0 |
1986-11-17 | Fracture | 1878.50 | 1881.50 | 0 |
1996-02-27 | Packing Device Capped w/Cement | 1862.00 | 1870.00 | 0 |
1996-02-27 | Perforation | 534.60 | 535.60 | 13 |
1996-05-01 | Remedial Casing Cementing | 534.60 | 535.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 588 | 0.0 | 0.0 | 0.0 |
1987 | 6754 | 0.0 | 0.0 | 0.0 |
1988 | 6676 | 0.0 | 0.0 | 0.0 |
1989 | 8518 | 0.0 | 0.0 | 0.0 |
1990 | 8145 | 0.0 | 0.0 | 0.0 |
1991 | 72 | 0.0 | 0.0 | 0.0 |
For data sources see[5]