X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424012203000

Well Details

Well ID: 0424012203000
Loading map...
Location: 00/03-22-042-01W4/0
Location Alias: 00/03-22-42-01 W4M
Location Alias 2: 00/03-22-042-01 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 01
Section: 22
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN 3B CHAUVS 3-22-42-1
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0333873
License Date: 2005-06-30
License Status: Abandoned
Spud Date: 2005-07-16
Final Drill Date: 2005-07-18
Well Total Depth: 699.50 m
Surface Hole Latitude: 52.624865
Surface Hole Longitude: -110.068533

For data sources see[1][2]

Well History

Date Event
2005-06-30 Obtained License
2005-07-17 Surface Casing Operation Performed
2005-07-18 Finished Drilling
2005-07-18 Well Log Performed
2005-07-18 Well Mode changed to Drilled and Cased
2005-07-19 Production Casing Operation Performed
2005-07-19 Rig Released
2005-07-19 Well Log Performed
2005-08-20 Perforation Treatment Performed - Jet Perforation
2005-08-20 Well Log Performed
2005-09-23 Well Fluid changed to Crude Oil
2005-09-23 Well Mode changed to Potential
2006-01-01 Well Began Production
2006-01-01 Well Fluid changed to Crude Oil
2006-01-01 Well Mode changed to Pumping
2009-02-01 Well Fluid changed to Crude Oil
2009-02-01 Well Mode changed to Suspended
2017-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-02 Plug Back Performed
2017-03-02 Well Fluid changed to Crude Oil
2017-03-02 Well Mode changed to Abandoned Zone
2017-03-30 Well Abandoned
2017-03-30 Well Fluid changed to Crude Oil
2017-03-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-20 Perforation 668.20 670.00 20
2017-03-02 Packing Device Capped w/Cement 649.00 659.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1056 0.0 0.0 0.0
2006 7713 0.0 0.0 0.0
2007 7883 0.0 0.0 0.0
2008 8575 0.0 0.0 0.0
2009 264 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-02 No Incident Encountered 0.00 0.00

For data sources see[6]

References