X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424200111020

Well Details

Well ID: 0424200111020
Loading map...
Location: 02/11-01-042-20W4/0
Location Alias: 02/11-01-42-20 W4M
Location Alias 2: 02/11-01-042-20 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 20
Section: 01
County/Municipality: Camrose County
Well Name: EMBER 102 BASHAW 11-1-42-20
Operator Name: Ember Resources Inc.
License Number: 0383614
License Date: 2007-10-22
License Status: Amended
Spud Date: 2007-11-10
Final Drill Date: 2007-11-18
Well Total Depth: 651.00 m
Surface Hole Latitude: 52.587567
Surface Hole Longitude: -112.757031

For data sources see[1][2]

Well History

Date Event
2007-10-22 Obtained License
2007-11-11 Surface Casing Operation Performed
2007-11-18 Finished Drilling
2007-11-18 Well Mode changed to Drilled and Cased
2007-11-19 Production Casing Operation Performed
2007-11-19 Rig Released
2007-11-19 Well Log Performed
2008-01-04 Perforation Treatment Performed - Jet Perforation
2008-01-04 Well Log Performed
2008-03-13 Well Began Production
2008-03-13 Well Fluid changed to Coalbed Methane-Coals Only
2008-03-13 Well Mode changed to Flowing
2010-01-19 Perforation Treatment Performed - Jet Perforation
2010-01-19 Well Log Performed
2010-01-20 Perforation Treatment Performed - Fractured
2010-01-24 Well Fluid changed to Coalbed Methane-Coals Only
2010-01-24 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-01-04 Perforation 271.10 271.60 13
2010-01-19 Perforation 579.00 579.50 13
2010-01-19 Perforation 576.20 576.70 13
2010-01-19 Perforation 573.80 574.30 13
2010-01-19 Perforation 566.00 566.50 13
2010-01-19 Perforation 563.20 563.70 13
2010-01-19 Perforation 553.80 554.30 13
2010-01-19 Perforation 547.80 548.30 13
2010-01-19 Perforation 533.70 534.20 13
2010-01-20 Fracture 533.70 583.50 0
2008-01-04 Perforation 264.90 265.90 13
2008-01-04 Perforation 249.10 250.10 13
2008-01-04 Perforation 227.60 228.10 13
2008-01-04 Perforation 219.60 221.10 13
2008-01-04 Perforation 212.90 217.90 13
2008-01-04 Perforation 209.30 210.30 13
2008-01-04 Perforation 201.90 204.40 13
2010-01-19 Perforation 580.50 583.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 6728 0.0 0.0 0.0
2009 8194 0.0 0.0 0.0

For data sources see[5]

References