X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424210209002

Well Details

Well ID: 0424210209002
Loading map...
Location: 00/09-02-042-21W4/2
Location Alias: 00/09-02-42-21 W4M
Location Alias 2: 00/09-02-042-21 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 21
Section: 02
County/Municipality: Camrose County
Well Name: EMBER BASHAW 9-2-42-21
Operator Name: Ember Resources Inc.
License Number: 0337101
License Date: 2005-08-25
License Status: Issued
Spud Date: 2005-09-25
Final Drill Date: 2005-09-26
Well Total Depth: 642.00 m
Surface Hole Latitude: 52.587714
Surface Hole Longitude: -112.911179

For data sources see[1][2]

Well History

Date Event
2005-08-25 Obtained License
2005-09-25 Surface Casing Operation Performed
2005-09-26 Finished Drilling
2005-09-26 Production Casing Operation Performed
2005-09-26 Rig Released
2005-09-26 Well Log Performed
2005-09-26 Well Mode changed to Drilled and Cased
2005-09-29 Perforation Treatment Performed - Jet Perforation
2005-10-01 Perforation Treatment Performed - Fractured
2005-10-07 Well Began Production
2005-10-07 Well Fluid changed to Coalbed Methane-Coals Only
2005-10-07 Well Mode changed to Flowing
2006-03-23 Well Structure changed to Commingled
2009-07-16 Perforation Treatment Performed - Jet Perforation
2009-07-16 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-29 Perforation 265.00 266.00 13
2005-09-29 Perforation 215.00 215.50 13
2005-09-29 Perforation 218.20 219.20 13
2005-09-29 Perforation 221.00 222.00 13
2005-09-29 Perforation 223.90 224.40 13
2005-09-29 Perforation 229.00 230.50 13
2005-09-29 Perforation 238.30 241.80 13
2005-09-29 Perforation 245.00 246.00 13
2005-10-01 Fracture 265.00 296.20 0
2005-10-01 Fracture 170.70 246.00 0
2009-07-16 Perforation 201.00 202.00 14
2005-09-29 Perforation 279.00 280.00 13
2009-07-16 Perforation 205.00 207.00 14
2009-07-16 Perforation 209.00 211.00 14
2009-07-16 Perforation 310.00 312.00 14
2005-09-29 Perforation 284.20 284.70 13
2005-09-29 Perforation 295.70 296.20 13
2005-09-29 Perforation 170.70 171.70 13
2005-09-29 Perforation 182.60 183.10 13
2005-09-29 Perforation 191.00 191.50 13
2005-09-29 Perforation 193.20 194.20 13
2005-09-29 Perforation 195.70 196.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 2044 0.0 0.0 0.0
2006 1943 0.0 0.0 0.0

For data sources see[5]

References