X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424211207020

Well Details

Well ID: 0424211207020
Loading map...
Location: 02/07-12-042-21W4/0
Location Alias: 02/07-12-42-21 W4M
Location Alias 2: 02/07-12-042-21 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 21
Section: 12
County/Municipality: Camrose County
Well Name: EMBER 102 BASHAW 7-12-42-21
Operator Name: Ember Resources Inc.
License Number: 0078554
License Date: 1979-10-11
License Status: Issued
Spud Date: 1979-10-13
Final Drill Date: 1979-10-24
Well Total Depth: 1084.00 m
Surface Hole Latitude: 52.598689
Surface Hole Longitude: -112.889810

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-11 Obtained License
1979-10-15 Drill Stem Test Performed
1979-10-24 Finished Drilling
1979-10-24 Well Log Performed
1979-10-26 Production Casing Operation Performed
1980-04-23 Perforation Treatment Performed - Jet Perforation
1980-04-23 Well Mode changed to Drilled and Cased
1980-05-27 Perforation Treatment Performed - Jet Perforation
1980-05-27 Well Mode changed to Drilled and Cased
1980-05-30 Perforation Treatment Performed - Fractured
1981-09-17 Well Log Performed
1981-09-18 Perforation Treatment Performed - Jet Perforation
1981-09-20 Perforation Treatment Performed - Cement Squeeze
1981-09-23 Well Log Performed
1981-09-24 Perforation Treatment Performed - Jet Perforation
1981-09-26 Well Log Performed
1981-09-27 Perforation Treatment Performed - Jet Perforation
1981-10-06 Perforation Treatment Performed - Jet Perforation
1981-10-07 Well Log Performed
1981-10-08 Perforation Treatment Performed - Jet Perforation
1981-10-08 Well Log Performed
1981-10-09 Perforation Treatment Performed - Jet Perforation
1981-10-11 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-04-23 Perforation 1011.00 1012.00 14
1981-09-27 Perforation 314.00 317.00 13
1981-10-06 Perforation 362.00 363.00 13
1981-10-08 Perforation 510.00 512.00 13
1981-10-09 Perforation 505.00 507.00 13
1981-10-11 Cement Squeeze 505.00 512.00 0
1980-05-27 Perforation 421.00 423.00 7
1980-05-27 Perforation 433.00 441.00 7
1980-05-27 Perforation 442.00 449.00 7
1980-05-27 Perforation 457.00 463.00 7
1980-05-30 Fracture 421.00 463.00 0
1981-09-18 Perforation 530.00 531.00 13
1981-09-20 Cement Squeeze 421.00 463.00 0
1981-09-24 Perforation 387.50 388.00 13

For data sources see[4]



References