X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424212312002

Well Details

Well ID: 0424212312002
Loading map...
Location: 00/12-23-042-21W4/2
Location Alias: 00/12-23-42-21 W4M
Location Alias 2: 00/12-23-042-21 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 21
Section: 23
County/Municipality: Camrose County
Well Name: EMBER BASHAW 12-23-42-21
Operator Name: Ember Resources Inc.
License Number: 0180951
License Date: 1995-09-25
License Status: Issued
Spud Date: 1995-09-30
Final Drill Date: 1995-10-02
Well Total Depth: 715.00 m
Surface Hole Latitude: 52.633023
Surface Hole Longitude: -112.926549

For data sources see[1][2]

Well History

Date Event
1995-09-02 Well Log Performed
1995-09-25 Obtained License
1995-10-01 Kick Occurred
1995-10-01 Surface Casing Operation Performed
1995-10-02 Finished Drilling
1995-10-02 Production Casing Operation Performed
1995-10-02 Rig Released
1995-10-02 Well Mode changed to Drilled and Cased
1995-10-06 Perforation Treatment Performed - Jet Perforation
1995-10-06 Well Log Performed
1995-10-12 Perforation Treatment Performed - Jet Perforation
1995-10-20 Perforation Treatment Performed - Jet Perforation
1995-10-20 Well Log Performed
1995-10-31 Perforation Treatment Performed - Jet Perforation
2001-07-05 Well Began Production
2001-07-05 Well Fluid changed to Gas
2001-07-05 Well Mode changed to Flowing
2005-02-28 Perforation Treatment Performed - Jet Perforation
2005-02-28 Well Log Performed
2005-03-03 Perforation Treatment Performed - Fractured
2005-03-14 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-10-06 Perforation 641.80 643.00 20
2005-02-28 Perforation 226.50 227.30 13
2005-02-28 Perforation 227.60 229.50 13
2005-02-28 Perforation 237.80 238.30 13
2005-02-28 Perforation 246.90 247.40 13
2005-02-28 Perforation 261.20 262.50 13
2005-02-28 Perforation 268.10 269.20 13
2005-02-28 Perforation 273.00 274.30 13
2005-02-28 Perforation 290.60 291.10 13
2005-02-28 Perforation 303.60 304.40 13
2005-02-28 Perforation 309.40 309.90 13
1995-10-12 Perforation 639.00 640.00 20
2005-02-28 Perforation 320.40 321.20 13
2005-03-03 Fracture 197.30 321.20 0
1995-10-12 Perforation 636.30 638.00 20
1995-10-20 Perforation 361.50 363.00 20
1995-10-31 Perforation 334.50 339.00 20
2005-02-28 Perforation 197.30 197.80 13
2005-02-28 Perforation 198.40 198.90 13
2005-02-28 Perforation 204.80 207.00 13
2005-02-28 Perforation 220.00 221.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4028 0.0 0.0 0.0
2002 8466 0.0 0.0 0.0
2003 8568 0.0 0.0 0.0
2004 4702 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-10-01 Kick 175.60 175.60
2014-08-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References