X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424212405020

Well Details

Well ID: 0424212405020
Loading map...
Location: 02/05-24-042-21W4/0
Location Alias: 02/05-24-42-21 W4M
Location Alias 2: 02/05-24-042-21 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 21
Section: 24
County/Municipality: Camrose County
Well Name: EMBER 102 BASHAW 5-24-42-21
Operator Name: Ember Resources Inc.
License Number: 0354157
License Date: 2006-03-15
License Status: Suspension
Spud Date: 2006-03-25
Final Drill Date: 2006-03-27
Well Total Depth: 1458.00 m
Surface Hole Latitude: 52.628330
Surface Hole Longitude: -112.905817

For data sources see[1][2]

Well History

Date Event
2006-03-15 Obtained License
2006-03-25 Surface Casing Operation Performed
2006-03-26 Direction Drilling Operation Performed - Deviate
2006-03-27 Finished Drilling
2006-03-27 Well Log Performed
2006-03-27 Well Mode changed to Drilled and Cased
2006-03-28 Production Casing Operation Performed
2006-03-28 Rig Released
2006-05-09 Well Log Performed
2006-05-31 Perforation Treatment Performed - Jet Perforation
2006-05-31 Well Log Performed
2006-12-15 Well Began Production
2006-12-15 Well Fluid changed to Gas
2006-12-15 Well Mode changed to Flowing
2007-06-07 Perforation Treatment Performed - Jet Perforation
2007-06-07 Well Log Performed
2007-10-31 Perforation Treatment Performed - Remedial Casing
2007-11-18 Perforation Treatment Performed - Remedial Casing
2007-11-20 Perforation Treatment Performed - Remedial Casing
2007-11-26 Perforation Treatment Performed - Jet Perforation
2007-12-01 Perforation Treatment Performed - Jet Perforation
2008-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-31 Perforation Treatment Performed - Jet Perforation
2008-10-31 Plug Back Performed
2008-10-31 Well Fluid changed to Gas
2008-10-31 Well Mode changed to Abandoned Zone
2010-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-27 Perforation Treatment Performed - Jet Perforation
2010-02-27 Plug Back Performed
2010-02-27 Well Log Performed
2010-04-21 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-03-26 660.10 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-05-31 Perforation 1388.00 1389.50 17
2007-11-26 Perforation 1388.50 1388.60 20
2007-12-01 Perforation 1388.00 1389.00 20
2008-10-31 Packing Device Capped w/Cement 1353.00 1361.00 0
2008-10-31 Perforation 1341.00 1343.20 20
2010-02-27 Packing Device Capped w/Cement 1327.00 1335.00 0
2010-02-27 Perforation 1267.00 1270.00 17
2010-04-21 Fracture 1267.00 1270.00 0
2006-05-31 Perforation 1384.00 1386.00 17
2007-06-07 Perforation 1373.10 1374.10 20
2007-06-07 Perforation 1371.10 1372.10 20
2007-06-07 Perforation 1366.10 1367.10 20
2007-06-07 Perforation 1363.10 1364.10 20
2007-10-31 Remedial Casing Cementing 1363.10 1374.10 0
2007-11-18 Remedial Casing Cementing 1384.00 1386.00 0
2007-11-20 Remedial Casing Cementing 1388.00 1389.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 390 0.0 0.0 0.0
2007 4973 0.0 0.0 0.0
2008 1146 0.0 0.0 0.0

For data sources see[6]

References