X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424220115004

Well Details

Well ID: 0424220115004
Loading map...
Location: 00/15-01-042-22W4/4
Location Alias: 00/15-01-42-22 W4M
Location Alias 2: 00/15-01-042-22 W4/04
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 22
Section: 01
County/Municipality: Camrose County
Well Name: EMBER BASHAW 15-1-42-22
Operator Name: Ember Resources Inc.
License Number: 0346885
License Date: 2005-12-28
License Status: Issued
Spud Date: 2006-02-01
Final Drill Date: 2006-02-02
Well Total Depth: 686.00 m
Surface Hole Latitude: 52.591064
Surface Hole Longitude: -113.035092

For data sources see[1][2]

Well History

Date Event
2005-12-28 Obtained License
2006-02-01 Surface Casing Operation Performed
2006-02-02 Finished Drilling
2006-02-02 Well Log Performed
2006-02-02 Well Mode changed to Drilled and Cased
2006-02-03 Production Casing Operation Performed
2006-02-03 Rig Released
2006-02-11 Perforation Treatment Performed - Jet Perforation
2006-02-11 Well Log Performed
2006-03-06 Perforation Treatment Performed - Fractured
2008-01-11 Perforation Treatment Performed - Jet Perforation
2009-12-16 Perforation Treatment Performed - Jet Perforation
2009-12-16 Well Began Production
2009-12-16 Well Fluid changed to Coalbed Methane-Coals and Other
2009-12-16 Well Log Performed
2009-12-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-11 Perforation 335.50 336.50 13
2006-02-11 Perforation 275.00 277.00 13
2006-02-11 Perforation 256.00 257.00 13
2006-02-11 Perforation 252.50 253.50 13
2006-02-11 Perforation 246.50 247.00 13
2006-02-11 Perforation 244.00 244.50 13
2006-02-11 Perforation 239.00 240.00 13
2006-02-11 Perforation 237.00 238.00 13
2006-02-11 Perforation 230.50 231.50 13
2006-02-11 Perforation 227.00 229.00 13
2006-02-11 Perforation 225.00 225.50 13
2006-02-11 Perforation 329.00 329.50 13
2006-02-11 Perforation 215.50 216.00 13
2006-02-11 Perforation 213.00 214.00 13
2006-03-06 Fracture 299.50 336.50 0
2006-03-06 Fracture 213.00 286.50 0
2008-01-11 Perforation 220.00 223.00 20
2008-01-11 Perforation 208.00 211.00 20
2009-12-16 Perforation 405.30 406.80 17
2006-02-11 Perforation 326.50 327.50 13
2006-02-11 Perforation 316.50 317.50 13
2006-02-11 Perforation 312.50 313.50 13
2006-02-11 Perforation 299.50 300.50 13
2006-02-11 Perforation 286.00 286.50 13
2006-02-11 Perforation 281.50 284.50 13
2006-02-11 Perforation 277.50 278.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 744 0.0 0.0 0.0
2010 8703 0.0 0.0 0.0
2011 8756 0.0 0.0 0.0
2012 8778 0.0 0.0 0.0
2013 8748 0.0 0.0 0.0
2014 8754 0.0 0.0 0.0
2015 8753 0.0 0.0 0.0
2016 8772 0.0 0.0 0.0
2017 8749 0.0 0.0 0.0
2018 8730 0.0 0.0 0.0
2019 8752 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[5]

References