X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424220512020

Well Details

Well ID: 0424220512020
Loading map...
Location: 02/12-05-042-22W4/0
Location Alias: 02/12-05-42-22 W4M
Location Alias 2: 02/12-05-042-22 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 22
Section: 05
County/Municipality: Camrose County
Well Name: EMBER 102 BASHAW 12-5-42-22
Operator Name: Ember Resources Inc.
License Number: 0408419
License Date: 2009-01-23
License Status: Issued
Spud Date: 2009-02-04
Final Drill Date: 2009-02-05
Well Total Depth: 795.00 m
Surface Hole Latitude: 52.588815
Surface Hole Longitude: -113.142747

For data sources see[1][2]

Well History

Date Event
2009-01-23 Obtained License
2009-02-04 Surface Casing Operation Performed
2009-02-05 Finished Drilling
2009-02-05 Production Casing Operation Performed
2009-02-05 Rig Released
2009-02-05 Well Mode changed to Drilled and Cased
2009-02-11 Well Log Performed
2009-02-15 Perforation Treatment Performed - Jet Perforation
2009-02-15 Well Log Performed
2009-02-18 Perforation Treatment Performed - Fractured
2009-03-20 Well Began Production
2009-03-20 Well Fluid changed to Coalbed Methane-Coals and Other
2009-03-20 Well Mode changed to Flowing
2009-09-16 Well Fluid changed to Coalbed Methane-Coals and Other
2009-09-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-15 Perforation 243.10 243.40 14
2009-02-15 Perforation 360.80 363.00 14
2009-02-15 Perforation 371.10 371.40 14
2009-02-15 Perforation 380.70 381.10 14
2009-02-15 Perforation 382.50 383.00 14
2009-02-15 Perforation 406.60 411.90 14
2009-02-15 Perforation 421.90 422.90 14
2009-02-15 Perforation 433.10 433.40 14
2009-02-15 Perforation 438.30 439.10 14
2009-02-15 Perforation 449.00 450.00 14
2009-02-15 Perforation 455.80 456.20 14
2009-02-15 Perforation 246.80 247.20 14
2009-02-15 Perforation 541.20 543.00 14
2009-02-15 Perforation 565.80 567.50 14
2009-02-15 Perforation 731.00 732.50 14
2009-02-18 Fracture 243.10 456.20 0
2009-02-15 Perforation 279.10 279.60 14
2009-02-15 Perforation 281.70 282.00 14
2009-02-15 Perforation 292.10 293.00 14
2009-02-15 Perforation 331.10 331.40 14
2009-02-15 Perforation 334.60 335.00 14
2009-02-15 Perforation 337.00 337.30 14
2009-02-15 Perforation 356.00 357.50 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6864 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8176 0.0 0.0 0.0
2015 8553 0.0 0.0 0.0
2016 8573 0.0 0.0 0.0
2017 8010 0.0 0.0 0.0
2018 8171 0.0 0.0 0.0
2019 8078 0.0 0.0 0.0
2020 2167 0.0 0.0 0.0

For data sources see[5]

References