X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424220601002

Well Details

Well ID: 0424220601002
Loading map...
Location: 00/01-06-042-22W4/2
Location Alias: 00/01-06-42-22 W4M
Location Alias 2: 00/01-06-042-22 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 22
Section: 06
County/Municipality: Ponoka County
Well Name: SUPREME BASHAW 1-6-42-22
Operator Name: Supreme Energy Inc.
License Number: 0003730
License Date: 1951-11-07
License Status: Issued
Spud Date: 1951-11-08
Final Drill Date: 1951-12-31
Well Total Depth: 1804.40 m
Surface Hole Latitude: 52.580968
Surface Hole Longitude: -113.150531

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-11-07 Obtained License
1951-12-07 Drill Stem Test Performed
1951-12-29 Drill Stem Test Performed
1951-12-31 Finished Drilling
1951-12-31 Well Mode changed to Drilled and Cased
1952-01-02 Perforation Treatment Performed - Bullet Perforation
1952-01-02 Production Casing Operation Performed
1964-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-16 Perforation Treatment Performed - Cement Squeeze
1964-02-19 Perforation Treatment Performed - Selective Bullet Perforations
1964-02-20 Perforation Treatment Performed - Bullet Perforation
1964-02-21 Perforation Treatment Performed - Acid Wash - No Pressure
1964-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-28 Well Began Production
1964-04-28 Well Fluid changed to Crude Oil
1964-04-28 Well Mode changed to Pumping
1966-06-29 Well Fluid changed to Crude Oil
1966-06-29 Well Mode changed to Suspended
1981-06-17 Well Fluid changed to Crude Oil
1981-06-17 Well Mode changed to Pumping
1981-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-07 Well Fluid changed to Crude Oil
1982-02-07 Well Mode changed to Suspended
1994-08-09 Well Log Performed
1994-08-10 Perforation Treatment Performed - Cement Squeeze
1994-08-10 Plug Back Performed
1994-08-10 Well Fluid changed to Crude Oil
1994-08-10 Well Mode changed to Abandoned Zone
1994-08-15 Well Log Performed
1994-08-16 Perforation Treatment Performed - Jet Perforation
1994-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-18 Well Log Performed
1994-08-20 Perforation Treatment Performed - Cement Squeeze
1994-08-22 Well Log Performed
1994-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-24 Perforation Treatment Performed - Jet Perforation
2001-05-14 Perforation Treatment Performed - Cement Squeeze
2001-05-15 Perforation Treatment Performed - Jet Perforation
2001-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-21 Perforation Treatment Performed - Jet Perforation
2002-08-21 Well Log Performed
2002-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-19 Perforation Treatment Performed - Cement Squeeze
2003-03-28 Perforation Treatment Performed - Jet Perforation
2003-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-01-02 Bullet Perforation 1782.80 1783.10 0
1981-08-06 Acid Treatment 1739.50 1747.70 0
1994-08-10 Cement Squeeze 1783.70 1783.70 0
1994-08-10 Cement Squeeze 1739.50 1747.70 0
1994-08-16 Perforation 1781.60 1782.00 13
1994-08-18 Acid Treatment 1781.60 1782.00 0
1994-08-20 Cement Squeeze 1781.60 1782.00 0
1994-08-24 Perforation 1780.40 1780.90 13
1994-08-24 Acid Treatment 1780.40 1780.90 0
2001-05-14 Cement Squeeze 1780.40 1780.90 0
2001-05-15 Perforation 1778.10 1778.60 13
1964-02-16 Acid Treatment 1782.80 1783.10 0
2001-05-16 Acid Treatment 1778.10 1778.60 0
2002-08-21 Perforation 1777.00 1778.10 20
2002-08-22 Acid Treatment 1777.00 1778.10 0
2003-03-19 Cement Squeeze 1777.00 1778.60 0
2003-03-28 Perforation 1778.10 1778.60 20
2003-03-30 Acid Treatment 1778.10 1778.60 0
1964-02-16 Cement Squeeze 1782.80 1783.10 0
1964-02-19 Selective Bullet Perforations 1783.70 1783.70 0
1964-02-20 Bullet Perforation 1739.50 1740.10 10
1964-02-20 Bullet Perforation 1744.70 1747.70 3
1964-02-21 Acid Wash 1783.70 1783.70 0
1964-02-22 Acid Treatment 1739.50 1747.70 0
1964-02-28 Acid Treatment 1783.70 1783.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1981 894 0.0 0.0 0.0

For data sources see[5]

References