X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424220604000

Well Details

Well ID: 0424220604000
Loading map...
Location: 00/04-06-042-22W4/0
Location Alias: 00/04-06-42-22 W4M
Location Alias 2: 00/04-06-042-22 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 22
Section: 06
County/Municipality: Ponoka County
Well Name: SUPREME BASHAW 4-6-42-22
Operator Name: Supreme Energy Inc.
License Number: 0024010
License Date: 1963-03-25
License Status: Issued
Spud Date: 1963-03-26
Final Drill Date: 1963-04-08
Well Total Depth: 1771.80 m
Surface Hole Latitude: 52.581151
Surface Hole Longitude: -113.168613

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-03-25 Obtained License
1963-04-07 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-04-08 Finished Drilling
1963-04-08 Well Mode changed to Drilled and Cased
1963-04-09 Production Casing Operation Performed
1963-05-02 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-05-03 Well Began Production
1963-05-03 Well Fluid changed to Crude Oil
1963-05-03 Well Mode changed to Flowing
1963-12-05 Perforation Treatment Performed - Cement Squeeze
1963-12-06 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-01-18 Well Fluid changed to Crude Oil
1964-01-18 Well Mode changed to Pumping
1966-09-29 Well Fluid changed to Crude Oil
1966-09-29 Well Mode changed to Suspended
1975-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-07-16 Perforation Treatment Performed - Jet Perforation
1975-07-22 Perforation Treatment Performed - Cement Squeeze
1975-07-23 Perforation Treatment Performed - Jet Perforation
1975-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-15 Perforation Treatment Performed - Jet Perforation
1976-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-21 Perforation Treatment Performed - Cement Squeeze
1977-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-23 Perforation Treatment Performed - Cement Squeeze
1977-09-29 Perforation Treatment Performed - Abrasa-Jet Perforation
1977-09-30 Perforation Treatment Performed - Cement Squeeze
1977-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-04 Perforation Treatment Performed - Open-Hole Completion
1977-10-12 Well Began Injection
1977-10-12 Well Fluid changed to Water
1977-10-12 Well Type changed to Disposal
1980-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-09 Perforation Treatment Performed - Acid Wash - No Pressure
1985-07-05 Perforation Treatment Performed - Acid Wash - No Pressure
1986-12-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-13 Perforation Treatment Performed - Jet Perforation
2003-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-04-07 Hydra Jet Perforation 1463.60 1463.60 0
1975-07-23 Perforation 1457.20 1460.90 7
1975-07-24 Acid Treatment 1457.20 1460.90 0
1976-06-15 Perforation 1465.50 1467.30 13
1976-06-15 Acid Treatment 1457.20 1467.30 0
1976-06-19 Acid Treatment 1457.20 1467.30 0
1977-09-21 Cement Squeeze 1457.20 1467.30 0
1977-09-23 Acid Treatment 1457.20 1467.30 0
1977-09-23 Cement Squeeze 1457.20 1467.30 0
1977-09-29 Hydra Jet Perforation 1750.80 1750.80 3
1977-09-30 Cement Squeeze 1750.80 1750.80 0
1963-05-02 Hydra Jet Perforation 1748.90 1748.90 0
1977-10-04 Open Hole/Barefoot Completion 1765.70 1771.80 0
1977-10-04 Acid Treatment 1765.70 1771.80 0
1980-09-27 Acid Treatment 1765.70 1771.80 0
1981-06-09 Acid Wash 1765.70 1771.80 0
1985-07-05 Acid Wash 1765.70 1771.80 0
1986-12-24 Acid Treatment 1765.70 1771.80 0
1987-07-22 Acid Treatment 1765.70 1771.80 0
1987-12-01 Acid Treatment 1765.70 1771.80 0
2003-02-13 Perforation 1760.00 1765.00 20
2003-02-14 Acid Treatment 1760.00 1765.00 0
1963-12-05 Cement Squeeze 1748.90 1748.90 0
2003-12-16 Acid Treatment 1760.00 1771.80 0
1963-12-06 Hydra Jet Perforation 1750.80 1750.80 0
1975-07-11 Packing Device Capped w/Cement 1528.90 1583.40 0
1975-07-12 Acid Treatment 1463.60 1463.60 0
1975-07-16 Perforation 1463.00 1464.90 13
1975-07-16 Acid Treatment 1463.00 1464.90 0
1975-07-22 Cement Squeeze 1463.00 1464.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1975 1 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References