X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424220610002

Well Details

Well ID: 0424220610002
Loading map...
Location: 00/10-06-042-22W4/2
Location Alias: 00/10-06-42-22 W4M
Location Alias 2: 00/10-06-042-22 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 22
Section: 06
County/Municipality: Ponoka County
Well Name: SUPREME BASHAW 10-6-42-22
Operator Name: Supreme Energy Inc.
License Number: 0025012
License Date: 1963-10-24
License Status: Issued
Spud Date: 1963-11-12
Final Drill Date: 1963-12-05
Well Total Depth: 1790.70 m
Surface Hole Latitude: 52.588292
Surface Hole Longitude: -113.156796

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-10-24 Obtained License
1963-11-12 Lost Circulation Occurred
1963-12-05 Finished Drilling
1963-12-05 Well Mode changed to Drilled and Cased
1963-12-07 Production Casing Operation Performed
1963-12-30 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-12-30 Perforation Treatment Performed - Bullet Perforation
1963-12-30 Perforation Treatment Performed - Selective Bullet Perforations
1964-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-16 Well Began Production
1964-01-16 Well Fluid changed to Crude Oil
1964-01-16 Well Mode changed to Flowing
1964-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-18 Perforation Treatment Performed - Cement Squeeze
1965-09-21 Perforation Treatment Performed - Jet Perforation
1965-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-10-14 Well Fluid changed to Crude Oil
1965-10-14 Well Mode changed to Abandoned Zone
1981-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-07 Perforation Treatment Performed - Cement Squeeze
1981-10-13 Well Log Performed
1993-01-22 Perforation Treatment Performed - Cement Squeeze
1993-01-26 Perforation Treatment Performed - Jet Perforation
1996-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-05 Perforation Treatment Performed - Cement Squeeze
1996-01-08 Perforation Treatment Performed - Jet Perforation
1996-01-08 Well Log Performed
1996-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-04 Well Log Performed
2010-10-05 Perforation Treatment Performed - Jet Perforation
2010-10-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-12-30 Hydra Jet Perforation 1775.20 1775.20 0
1965-09-21 Perforation 1759.00 1760.50 7
1965-09-23 Acid Treatment 1759.00 1760.50 0
1981-10-07 Acid Treatment 1759.00 1760.50 0
1981-10-07 Cement Squeeze 1759.00 1760.50 0
1993-01-22 Cement Squeeze 1775.20 1775.20 0
1993-01-26 Perforation 1772.60 1773.10 13
1996-01-05 Acid Treatment 1772.60 1773.10 0
1996-01-05 Cement Squeeze 1772.60 1773.10 0
1996-01-08 Perforation 1771.00 1771.50 18
1996-01-12 Acid Treatment 1771.00 1771.50 0
1963-12-30 Selective Bullet Perforations 1736.80 1737.10 0
2010-10-05 Perforation 1766.60 1769.50 20
1963-12-30 Bullet Perforation 1735.20 1735.80 10
1963-12-30 Selective Bullet Perforations 1725.20 1726.70 0
1963-12-30 Selective Bullet Perforations 1723.60 1723.60 0
1963-12-30 Bullet Perforation 1718.80 1719.40 10
1964-01-05 Acid Treatment 1723.60 1737.10 0
1964-09-22 Acid Treatment 1718.80 1737.10 0
1965-09-18 Cement Squeeze 1718.80 1737.10 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1963-11-12 Lost Circulation 18.30 18.30

For data sources see[5]

References