X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424220612000

Well Details

Well ID: 0424220612000
Loading map...
Location: 00/12-06-042-22W4/0
Location Alias: 00/12-06-42-22 W4M
Location Alias 2: 00/12-06-042-22 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 22
Section: 06
County/Municipality: Ponoka County
Well Name: SUPREME BASHAW 12-6-42-22
Operator Name: Supreme Energy Inc.
License Number: 0023307
License Date: 1962-11-08
License Status: Issued
Spud Date: 1962-11-11
Final Drill Date: 1962-11-29
Well Total Depth: 1754.70 m
Surface Hole Latitude: 52.588201
Surface Hole Longitude: -113.168611

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-11-08 Obtained License
1962-11-26 Drill Stem Test Performed
1962-11-29 Finished Drilling
1962-11-29 Well Mode changed to Drilled and Cased
1962-11-30 Drill Stem Test Performed
1962-12-02 Production Casing Operation Performed
1962-12-18 Perforation Treatment Performed - Jet Perforation
1962-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-02 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-13 Perforation Treatment Performed - Cement Squeeze
1963-01-29 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-01-29 Perforation Treatment Performed - Bullet Perforation
1963-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-02-08 Well Began Production
1963-02-08 Well Fluid changed to Crude Oil
1963-02-08 Well Mode changed to Flowing
1963-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-15 Well Fluid changed to Crude Oil
1963-03-15 Well Mode changed to Flowing
1963-11-23 Perforation Treatment Performed - Selective Bullet Perforations
1963-11-24 Perforation Treatment Performed - Cement Squeeze
1964-01-07 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-26 Perforation Treatment Performed - Cement Squeeze
1974-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-30 Well Fluid changed to Crude Oil
1974-06-30 Well Mode changed to Flowing
1975-07-01 Well Fluid changed to Crude Oil
1975-07-01 Well Mode changed to Suspended
1975-10-24 Well Fluid changed to Crude Oil
1975-10-24 Well Mode changed to Pumping
1976-02-01 Well Fluid changed to Crude Oil
1976-02-01 Well Mode changed to Suspended
1978-07-20 Well Fluid changed to Crude Oil
1978-07-20 Well Mode changed to Flowing
1994-03-08 Perforation Treatment Performed - Cement Squeeze
1994-03-09 Well Log Performed
1994-03-11 Perforation Treatment Performed - Jet Perforation
1994-03-11 Well Log Performed
1994-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-15 Well Fluid changed to Crude Oil
1994-03-15 Well Mode changed to Pumping
2001-04-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-04-20 Perforation Treatment Performed - Jet Perforation
2002-07-10 Well Log Performed
2002-07-11 Perforation Treatment Performed - Cement Squeeze
2002-07-12 Perforation Treatment Performed - Jet Perforation
2002-07-12 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-12-18 Perforation 1708.10 1710.80 7
1963-03-12 Acid Treatment 1708.40 1711.10 0
1963-11-23 Selective Bullet Perforations 1690.70 1691.00 0
1963-11-23 Selective Bullet Perforations 1691.90 1692.60 0
1963-11-23 Selective Bullet Perforations 1693.80 1694.70 0
1963-11-24 Cement Squeeze 1739.50 1739.50 0
1964-01-07 Hydra Jet Perforation 1740.10 1740.10 0
1964-01-08 Acid Treatment 1740.10 1740.10 0
1974-06-25 Acid Treatment 1690.70 1712.40 0
1974-06-26 Acid Treatment 1690.70 1712.40 0
1974-06-26 Cement Squeeze 1690.70 1712.40 0
1962-12-21 Acid Treatment 1708.10 1710.80 0
1974-06-29 Acid Treatment 1740.10 1740.10 0
1994-03-08 Cement Squeeze 1740.10 1740.10 0
1994-03-11 Perforation 1737.90 1738.40 13
1994-03-14 Acid Treatment 1737.90 1738.40 0
2001-04-19 Packing Device Capped w/Cement 1737.90 1738.40 0
2001-04-20 Perforation 1736.00 1736.50 13
2001-04-20 Acid Treatment 1736.00 1736.50 0
2002-07-11 Cement Squeeze 1736.00 1736.50 0
2002-07-12 Perforation 1734.00 1735.00 20
1962-12-23 Acid Treatment 1708.10 1710.80 0
1963-01-02 Hydra Jet Perforation 1738.30 1738.30 0
1963-01-08 Acid Treatment 1738.30 1738.30 0
1963-01-13 Cement Squeeze 1738.30 1738.30 0
1963-01-29 Bullet Perforation 1708.40 1711.10 7
1963-01-29 Hydra Jet Perforation 1739.50 1739.50 0
1963-02-04 Acid Treatment 1739.50 1739.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 1478 0.0 0.0 0.0
1970 837 0.0 0.0 0.0
1971 534 0.0 0.0 0.0
1972 3288 0.0 0.0 0.0
1973 3186 0.0 0.0 0.0
1975 364 0.0 0.0 0.0
1978 362 0.0 0.0 0.0
1981 192 0.0 0.0 0.0
1982 22 0.0 0.0 0.0
1983 1442 0.0 0.0 0.0
1984 336 0.0 0.0 0.0
1994 6386 0.0 0.0 0.0
1995 8423 0.0 0.0 0.0
1996 8325 0.0 0.0 0.0
1997 7625 0.0 0.0 0.0
1998 8065 0.0 0.0 0.0
1999 8246 0.0 0.0 0.0
2000 8695 0.0 0.0 0.0
2001 7232 0.0 0.0 0.0
2002 7044 0.0 0.0 0.0
2003 8275 0.0 0.0 0.0
2004 6394 0.0 0.0 0.0
2005 5901 0.0 0.0 0.0
2006 8708 0.0 0.0 0.0
2007 7541 0.0 0.0 0.0
2008 7823 0.0 0.0 0.0
2009 8751 0.0 0.0 0.0
2010 8659 0.0 0.0 0.0
2011 8751 0.0 0.0 0.0
2012 7765 0.0 0.0 0.0
2013 8732 0.0 0.0 0.0
2014 7511 0.0 0.0 0.0
2015 1248 0.0 0.0 0.0
2016 5123 0.0 0.0 0.0
2017 8655 0.0 0.0 0.0
2018 7835 0.0 0.0 0.0
2019 8270 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2002-07-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References