X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424220702002

Well Details

Well ID: 0424220702002
Loading map...
Location: 00/02-07-042-22W4/2
Location Alias: 00/02-07-42-22 W4M
Location Alias 2: 00/02-07-042-22 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 22
Section: 07
County/Municipality: Ponoka County
Well Name: SUPREME BASHAW 2-7-42-22
Operator Name: Supreme Energy Inc.
License Number: 0024043
License Date: 1963-04-10
License Status: Abandoned
Spud Date: 1963-04-11
Final Drill Date: 1963-04-26
Well Total Depth: 1792.80 m
Surface Hole Latitude: 52.595528
Surface Hole Longitude: -113.156799

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-04-10 Obtained License
1963-04-26 Finished Drilling
1963-04-26 Well Mode changed to Drilled and Cased
1963-04-27 Production Casing Operation Performed
1963-05-13 Perforation Treatment Performed - Bullet Perforation
1963-05-13 Perforation Treatment Performed - Selective Bullet Perforations
1963-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-06-06 Well Began Production
1963-06-06 Well Fluid changed to Crude Oil
1963-06-06 Well Mode changed to Gas Lift
1963-10-16 Well Fluid changed to Crude Oil
1963-10-16 Well Mode changed to Pumping
1966-06-09 Well Fluid changed to Crude Oil
1966-06-09 Well Mode changed to Suspended
1974-07-03 Perforation Treatment Performed - Cement Squeeze
1974-07-03 Well Fluid changed to Crude Oil
1974-07-03 Well Mode changed to Abandoned Zone
1987-07-21 Well Log Performed
1989-09-25 Well Log Performed
1990-08-16 Well Log Performed
1991-05-21 Well Log Performed
1994-04-20 Perforation Treatment Performed - Cement Squeeze
1994-04-21 Well Log Performed
1994-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-22 Perforation Treatment Performed - Jet Perforation
1994-12-15 Well Log Performed
1994-12-17 Perforation Treatment Performed - Cement Squeeze
1994-12-19 Well Log Performed
1994-12-20 Perforation Treatment Performed - Jet Perforation
1994-12-21 Perforation Treatment Performed - Acid Wash - No Pressure
2002-08-28 Perforation Treatment Performed - Jet Perforation
2002-08-28 Well Log Performed
2002-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-28 Well Log Performed
2006-01-05 Well Log Performed
2006-01-07 Well Log Performed
2007-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-07 Plug Back Performed
2007-01-12 Perforation Treatment Performed - Jet Perforation
2007-01-12 Well Log Performed
2007-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-13 Perforation Treatment Performed - Remedial Casing
2007-01-14 Perforation Treatment Performed - Jet Perforation
2007-01-14 Well Log Performed
2007-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-17 Perforation Treatment Performed - Remedial Casing
2007-01-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-05-13 Selective Bullet Perforations 1735.20 1741.00 0
1994-12-17 Cement Squeeze 1772.30 1772.80 0
1994-12-20 Perforation 1770.00 1771.20 18
1994-12-21 Acid Wash 1770.00 1771.20 0
2002-08-28 Perforation 1766.90 1770.00 20
2002-08-29 Acid Treatment 1766.90 1771.20 0
2007-01-07 Packing Device Capped w/Cement 1742.00 1750.00 0
2007-01-07 Packing Device Capped w/Cement 1712.00 1720.00 0
2007-01-12 Perforation 448.00 449.00 13
2007-01-13 Remedial Casing Cementing 448.00 449.00 0
2007-01-13 Packing Device Capped w/Cement 437.00 445.00 0
1963-05-13 Selective Bullet Perforations 1731.30 1732.50 0
2007-01-14 Perforation 424.00 425.00 13
2007-01-17 Remedial Casing Cementing 424.00 425.00 0
2007-01-17 Packing Device Capped w/Cement 414.00 422.00 0
1963-05-13 Selective Bullet Perforations 1723.00 1726.10 0
1963-05-13 Bullet Perforation 1772.70 1772.70 7
1963-05-15 Acid Treatment 1723.00 1741.00 0
1974-07-03 Cement Squeeze 1723.00 1741.00 0
1994-04-20 Cement Squeeze 1772.70 1772.70 0
1994-04-22 Perforation 1772.30 1772.80 13
1994-04-22 Acid Treatment 1772.30 1772.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0

For data sources see[5]

References