X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424223010020

Well Details

Well ID: 0424223010020
Loading map...
Location: 02/10-30-042-22W4/0
Location Alias: 02/10-30-42-22 W4M
Location Alias 2: 02/10-30-042-22 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 22
Section: 30
County/Municipality: Ponoka County
Well Name: EMBER 102 BASHAW 10-30-42-22
Operator Name: Ember Resources Inc.
License Number: 0340382
License Date: 2005-10-18
License Status: Issued
Spud Date: 2005-10-29
Final Drill Date: 2005-10-30
Well Total Depth: 695.00 m
Surface Hole Latitude: 52.645022
Surface Hole Longitude: -113.158414

For data sources see[1][2]

Well History

Date Event
2005-10-18 Obtained License
2005-10-30 Finished Drilling
2005-10-30 Surface Casing Operation Performed
2005-10-30 Well Mode changed to Drilled and Cased
2005-10-31 Production Casing Operation Performed
2005-10-31 Rig Released
2005-10-31 Well Log Performed
2005-11-09 Perforation Treatment Performed - Jet Perforation
2005-11-10 Perforation Treatment Performed - Fractured
2005-11-10 Perforation Treatment Performed - Jet Perforation
2005-11-21 Well Began Production
2005-11-21 Well Fluid changed to Coalbed Methane-Coals Only
2005-11-21 Well Mode changed to Flowing
2006-03-29 Well Fluid changed to Coalbed Methane-Coals Only
2006-03-29 Well Mode changed to Flowing
2008-10-14 Perforation Treatment Performed - Jet Perforation
2008-10-14 Well Fluid changed to Coalbed Methane-Coals and Other
2008-10-14 Well Log Performed
2008-10-14 Well Mode changed to Flowing
2008-11-19 Well Log Performed
2011-10-03 Well Fluid changed to Coalbed Methane-Coals and Other
2011-10-03 Well Mode changed to Pumping
2013-02-22 Well Fluid changed to Coalbed Methane-Coals and Other
2013-02-22 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-11-09 Perforation 352.50 353.00 13
2005-11-10 Perforation 283.50 284.50 13
2005-11-10 Perforation 299.50 300.50 13
2005-11-10 Perforation 315.50 317.00 13
2005-11-10 Perforation 320.00 321.50 13
2005-11-10 Perforation 325.00 326.50 13
2005-11-10 Fracture 256.50 326.50 0
2008-10-14 Perforation 473.00 474.50 14
2008-10-14 Perforation 656.50 659.00 14
2005-11-09 Perforation 366.00 366.50 13
2005-11-09 Perforation 372.00 373.50 13
2005-11-10 Fracture 352.50 373.50 0
2005-11-10 Perforation 256.50 258.50 13
2005-11-10 Perforation 260.00 260.50 13
2005-11-10 Perforation 261.00 262.00 13
2005-11-10 Perforation 277.00 277.50 13
2005-11-10 Perforation 279.50 280.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 976 0.0 0.0 0.0
2006 8701 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8771 0.0 0.0 0.0
2009 8749 0.0 0.0 0.0
2010 8727 0.0 0.0 0.0
2011 8670 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8462 0.0 0.0 0.0
2015 8710 0.0 0.0 0.0
2016 8718 0.0 0.0 0.0
2017 8450 0.0 0.0 0.0
2018 8543 0.0 0.0 0.0
2019 8260 0.0 0.0 0.0
2020 2151 0.0 0.0 0.0

For data sources see[5]

References