X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424230110002

Well Details

Well ID: 0424230110002
Loading map...
Location: 00/10-01-042-23W4/2
Location Alias: 00/10-01-42-23 W4M
Location Alias 2: 00/10-01-042-23 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 23
Section: 01
County/Municipality: Ponoka County
Well Name: SUPREME BASHAW 10-1-42-23
Operator Name: Supreme Energy Inc.
License Number: 0023930
License Date: 1963-03-04
License Status: Issued
Spud Date: 1963-03-10
Final Drill Date: 1963-03-21
Well Total Depth: 1742.20 m
Surface Hole Latitude: 52.588567
Surface Hole Longitude: -113.180019

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-03-04 Obtained License
1963-03-21 Finished Drilling
1963-03-21 Well Mode changed to Drilled and Cased
1963-03-22 Production Casing Operation Performed
1963-04-24 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-04-24 Perforation Treatment Performed - Selective Bullet Perforations
1963-05-18 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1963-07-17 Well Began Production
1963-07-17 Well Fluid changed to Crude Oil
1963-07-17 Well Mode changed to Pumping
1965-07-30 Well Fluid changed to Crude Oil
1965-07-30 Well Mode changed to Suspended
1975-10-08 Well Fluid changed to Crude Oil
1975-10-08 Well Mode changed to Pumping
1976-02-01 Well Fluid changed to Crude Oil
1976-02-01 Well Mode changed to Suspended
1981-06-29 Well Fluid changed to Crude Oil
1981-06-29 Well Mode changed to Pumping
1982-09-23 Perforation Treatment Performed - Cement Squeeze
1982-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-25 Perforation Treatment Performed - Jet Perforation
1982-09-25 Well Fluid changed to Crude Oil
1982-09-25 Well Mode changed to Pumping
1985-10-30 Perforation Treatment Performed - Cement Squeeze
1985-10-31 Well Log Performed
1985-11-01 Perforation Treatment Performed - Jet Perforation
1985-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-24 Well Fluid changed to Crude Oil
1990-08-24 Well Mode changed to Flowing
1993-07-27 Well Fluid changed to Crude Oil
1993-07-27 Well Mode changed to Pumping
2001-04-24 Perforation Treatment Performed - Jet Perforation
2001-04-25 Perforation Treatment Performed - Cement Squeeze
2001-04-26 Perforation Treatment Performed - Remedial Casing
2001-04-29 Perforation Treatment Performed - Jet Perforation
2001-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-28 Perforation Treatment Performed - Jet Perforation
2002-08-28 Well Log Performed
2002-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-04-24 Hydra Jet Perforation 1729.10 1729.10 0
1982-09-25 Perforation 1724.50 1724.80 13
1982-09-25 Acid Treatment 1724.50 1724.80 0
1985-10-30 Cement Squeeze 1724.50 1724.80 0
1985-11-01 Perforation 1725.40 1725.60 4
1985-11-02 Acid Treatment 1725.40 1725.60 0
2001-04-24 Perforation 688.00 689.00 13
2001-04-25 Cement Squeeze 1725.40 1725.60 0
2001-04-26 Remedial Casing Cementing 688.00 689.00 0
2001-04-29 Perforation 1723.00 1723.70 17
2001-04-30 Acid Treatment 1723.00 1723.70 0
1963-04-24 Selective Bullet Perforations 1679.80 1680.40 0
2002-08-28 Perforation 1720.00 1722.50 20
2002-08-29 Acid Treatment 1720.00 1723.70 0
1963-04-24 Selective Bullet Perforations 1681.60 1683.40 0
1963-04-24 Selective Bullet Perforations 1684.00 1684.00 0
1963-04-24 Acid Treatment 1679.80 1729.10 0
1963-05-18 Packing Device Capped w/Cement 1727.90 1727.90 0
1963-05-18 Hydra Jet Perforation 1727.00 1727.00 0
1982-09-23 Cement Squeeze 1727.00 1727.00 0
1982-09-23 Cement Squeeze 1679.80 1684.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1975 290 0.0 0.0 0.0
1981 835 0.0 0.0 0.0
1982 456 0.0 0.0 0.0
1983 208 0.0 0.0 0.0
1985 1105 0.0 0.0 0.0
1986 2038 0.0 0.0 0.0
1987 2505 0.0 0.0 0.0
1988 8673 0.0 0.0 0.0
1989 8319 0.0 0.0 0.0
1990 8289 0.0 0.0 0.0
1991 8155 0.0 0.0 0.0
1992 8737 0.0 0.0 0.0
1993 6599 0.0 0.0 0.0
1994 3437 0.0 0.0 0.0
1995 6045 0.0 0.0 0.0
1996 8500 0.0 0.0 0.0
1997 7326 0.0 0.0 0.0
1998 8158 0.0 0.0 0.0
1999 7124 0.0 0.0 0.0
2000 8631 0.0 0.0 0.0
2001 5217 0.0 0.0 0.0
2002 6548 0.0 0.0 0.0
2003 8404 0.0 0.0 0.0
2004 8702 0.0 0.0 0.0
2005 8133 0.0 0.0 0.0
2006 8687 0.0 0.0 0.0
2007 8569 0.0 0.0 0.0
2008 7564 0.0 0.0 0.0
2009 8663 0.0 0.0 0.0
2010 8575 0.0 0.0 0.0
2011 8386 0.0 0.0 0.0
2012 7557 0.0 0.0 0.0
2013 8624 0.0 0.0 0.0
2014 8699 0.0 0.0 0.0
2015 8224 0.0 0.0 0.0
2016 7096 0.0 0.0 0.0
2017 8667 0.0 0.0 0.0
2018 7735 0.0 0.0 0.0
2019 8656 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References