X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424231216000

Well Details

Well ID: 0424231216000
Loading map...
Location: 00/16-12-042-23W4/0
Location Alias: 00/16-12-42-23 W4M
Location Alias 2: 00/16-12-042-23 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 23
Section: 12
County/Municipality: Ponoka County
Well Name: EMBER BASHAW 16-12-42-23
Operator Name: Ember Resources Inc.
License Number: 0184363
License Date: 1996-01-09
License Status: Amended
Spud Date: 1996-01-12
Final Drill Date: 1996-01-16
Well Total Depth: 830.00 m
Surface Hole Latitude: 52.605100
Surface Hole Longitude: -113.176420

For data sources see[1][2]

Well History

Date Event
1996-01-09 Obtained License
1996-01-12 Conductor Casing Operation Performed
1996-01-12 Lost Circulation Occurred
1996-01-16 Finished Drilling
1996-01-17 Well Log Performed
1996-01-18 Production Casing Operation Performed
1996-01-18 Rig Released
1996-01-18 Well Mode changed to Drilled and Cased
1996-01-29 Well Log Performed
1996-02-05 Well Log Performed
1996-02-06 Perforation Treatment Performed - Jet Perforation
1999-04-27 Well Began Production
1999-04-27 Well Fluid changed to Gas
1999-04-27 Well Mode changed to Flowing
2003-11-07 Perforation Treatment Performed - Jet Perforation
2003-11-07 Well Log Performed
2003-11-10 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-02-06 Perforation 557.00 558.00 13
2003-11-07 Perforation 332.80 333.80 13
2003-11-07 Perforation 336.40 337.30 13
2003-11-07 Perforation 352.10 353.00 13
2003-11-07 Perforation 354.40 356.60 13
2003-11-07 Perforation 373.80 375.00 13
2003-11-07 Perforation 397.00 401.00 13
2003-11-07 Perforation 424.80 425.80 13
2003-11-07 Perforation 431.00 432.00 13
2003-11-07 Perforation 443.00 444.00 13
2003-11-07 Perforation 448.90 449.90 13
1996-02-06 Perforation 542.50 543.50 13
2003-11-10 Fracture 268.00 449.90 0
1996-02-06 Perforation 538.00 540.50 13
1996-02-06 Perforation 534.00 535.00 13
1996-02-06 Perforation 531.50 532.50 13
1996-02-06 Perforation 520.50 521.50 13
1996-02-06 Perforation 486.00 487.00 13
2003-11-07 Perforation 268.00 269.00 13
2003-11-07 Perforation 325.50 327.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 5373 0.0 0.0 0.0
2000 7691 0.0 0.0 0.0
2001 7741 0.0 0.0 0.0
2002 8648 0.0 0.0 0.0
2003 8664 0.0 0.0 0.0
2004 8195 0.0 0.0 0.0
2005 7764 0.0 0.0 0.0
2006 6429 0.0 0.0 0.0
2007 8496 0.0 0.0 0.0
2008 8254 0.0 0.0 0.0
2009 8686 0.0 0.0 0.0
2010 8729 0.0 0.0 0.0
2011 8521 0.0 0.0 0.0
2012 8705 0.0 0.0 0.0
2013 8700 0.0 0.0 0.0
2014 8558 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8733 0.0 0.0 0.0
2017 8720 0.0 0.0 0.0
2018 8750 0.0 0.0 0.0
2019 8548 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-01-12 Lost Circulation 37.00 240.00

For data sources see[6]

References