X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424231216002

Well Details

Well ID: 0424231216002
Loading map...
Location: 00/16-12-042-23W4/2
Location Alias: 00/16-12-42-23 W4M
Location Alias 2: 00/16-12-042-23 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 23
Section: 12
County/Municipality: Ponoka County
Well Name: EMBER BASHAW 16-12-42-23
Operator Name: Ember Resources Inc.
License Number: 0184363
License Date: 1996-01-09
License Status: Amended
Spud Date: 1996-01-12
Final Drill Date: 1996-01-16
Well Total Depth: 830.00 m
Surface Hole Latitude: 52.605100
Surface Hole Longitude: -113.176420

For data sources see[1][2]

Well History

Date Event
1996-01-09 Obtained License
1996-01-12 Conductor Casing Operation Performed
1996-01-12 Lost Circulation Occurred
1996-01-16 Finished Drilling
1996-01-16 Well Mode changed to Drilled and Cased
1996-01-17 Well Log Performed
1996-01-18 Production Casing Operation Performed
1996-01-18 Rig Released
1996-01-29 Well Log Performed
1996-02-05 Well Log Performed
1996-02-06 Perforation Treatment Performed - Jet Perforation
2003-11-07 Perforation Treatment Performed - Jet Perforation
2003-11-07 Well Log Performed
2003-11-10 Perforation Treatment Performed - Fractured
2003-11-17 Well Began Production
2003-11-17 Well Fluid changed to Coalbed Methane-Coals Only
2003-11-17 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-02-06 Perforation 557.00 558.00 13
2003-11-07 Perforation 332.80 333.80 13
2003-11-07 Perforation 336.40 337.30 13
2003-11-07 Perforation 352.10 353.00 13
2003-11-07 Perforation 354.40 356.60 13
2003-11-07 Perforation 373.80 375.00 13
2003-11-07 Perforation 397.00 401.00 13
2003-11-07 Perforation 424.80 425.80 13
2003-11-07 Perforation 431.00 432.00 13
2003-11-07 Perforation 443.00 444.00 13
2003-11-07 Perforation 448.90 449.90 13
1996-02-06 Perforation 542.50 543.50 13
2003-11-10 Fracture 268.00 449.90 0
1996-02-06 Perforation 538.00 540.50 13
1996-02-06 Perforation 534.00 535.00 13
1996-02-06 Perforation 531.50 532.50 13
1996-02-06 Perforation 520.50 521.50 13
1996-02-06 Perforation 486.00 487.00 13
2003-11-07 Perforation 268.00 269.00 13
2003-11-07 Perforation 325.50 327.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1098 0.0 0.0 0.0
2004 7455 0.0 0.0 0.0
2005 7761 0.0 0.0 0.0
2006 5208 0.0 0.0 0.0
2007 5634 0.0 0.0 0.0
2008 7997 0.0 0.0 0.0
2009 8331 0.0 0.0 0.0
2010 8649 0.0 0.0 0.0
2011 8257 0.0 0.0 0.0
2012 8692 0.0 0.0 0.0
2013 8578 0.0 0.0 0.0
2014 8566 0.0 0.0 0.0
2015 8756 0.0 0.0 0.0
2016 8748 0.0 0.0 0.0
2017 8566 0.0 0.0 0.0
2018 8747 0.0 0.0 0.0
2019 8643 0.0 0.0 0.0
2020 2096 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-01-12 Lost Circulation 37.00 240.00

For data sources see[6]

References