X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424232113000

Well Details

Well ID: 0424232113000
Loading map...
Location: 00/13-21-042-23W4/0
Location Alias: 00/13-21-42-23 W4M
Location Alias 2: 00/13-21-042-23 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 23
Section: 21
County/Municipality: Ponoka County
Well Name: ENHANCEENERGY BASHAW 13-21-42-23
Operator Name: Enhance Energy Inc.
License Number: 0142267
License Date: 1989-12-19
License Status: Suspension
Spud Date: 1990-01-26
Final Drill Date: 1990-02-10
Well Total Depth: 1810.00 m
Surface Hole Latitude: 52.632834
Surface Hole Longitude: -113.263966

For data sources see[1][2]

Well History

Date Event
1989-12-19 Obtained License
1990-01-28 Surface Casing Operation Performed
1990-01-31 Direction Drilling Operation Performed - Deviate
1990-02-10 Finished Drilling
1990-02-10 Well Log Performed
1990-02-10 Well Mode changed to Drilled and Cased
1990-02-12 Production Casing Operation Performed
1990-02-13 Rig Released
1990-02-13 Well Log Performed
1990-03-01 Well Log Performed
1990-03-02 Perforation Treatment Performed - Jet Perforation
1990-03-03 Well Began Production
1990-03-03 Well Fluid changed to Crude Oil
1990-03-03 Well Mode changed to Flowing
1991-07-10 Well Fluid changed to Crude Oil
1991-07-10 Well Mode changed to Pumping
2001-03-05 Well Log Performed
2001-03-07 Well Log Performed
2001-03-10 Perforation Treatment Performed - Cement Squeeze
2001-03-10 Plug Back Performed
2001-03-12 Well Log Performed
2001-03-13 Perforation Treatment Performed - Jet Perforation
2001-11-22 Perforation Treatment Performed - Jet Perforation
2001-11-22 Well Log Performed
2003-07-14 Perforation Treatment Performed - Jet Perforation
2003-07-14 Well Log Performed
2003-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-06-03 Well Log Performed
2004-06-10 Well Log Performed
2004-06-12 Perforation Treatment Performed - Jet Perforation
2004-06-12 Well Log Performed
2009-11-24 Well Log Performed
2009-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-25 Plug Back Performed
2009-11-25 Well Fluid changed to Crude Oil
2009-11-25 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-01-31 1051.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-02 Perforation 1770.10 1775.70 13
2001-03-10 Cement Squeeze 1770.10 1775.70 0
2001-03-13 Perforation 1764.00 1767.00 20
2001-11-22 Perforation 1757.00 1761.00 18
2003-07-14 Perforation 1755.00 1756.00 17
2003-07-15 Acid Treatment 1755.00 1756.00 0
2004-06-12 Perforation 1751.00 1753.00 17
2009-11-25 Packing Device Capped w/Cement 1735.30 1745.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 4582 0.0 0.0 0.0
1991 3979 0.0 0.0 0.0
1992 5691 0.0 0.0 0.0
1993 8432 0.0 0.0 0.0
1994 8561 0.0 0.0 0.0
1995 8368 0.0 0.0 0.0
1996 8631 0.0 0.0 0.0
1997 7698 0.0 0.0 0.0
1998 8319 0.0 0.0 0.0
1999 8121 0.0 0.0 0.0
2000 8729 0.0 0.0 0.0
2001 7368 0.0 0.0 0.0
2002 8236 0.0 0.0 0.0
2003 8524 0.0 0.0 0.0
2004 6401 0.0 0.0 0.0
2005 8436 0.0 0.0 0.0
2006 8691 0.0 0.0 0.0
2007 8645 0.0 0.0 0.0
2008 3287 0.0 0.0 0.0

For data sources see[6]

References