If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424241110003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.601733,"lon":-113.346675,"icon":""}]} |
Location: 00/10-11-042-24W4/3 | |
Location Alias: 00/10-11-42-24 W4M | |
Location Alias 2: 00/10-11-042-24 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 24 | |
Section: 11 | |
County/Municipality: Ponoka County | |
Well Name: EMBER CHIGWL N 10-11-42-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0191717 | |
License Date: 1996-09-25 | |
License Status: Suspension | |
Spud Date: 1996-09-30 | |
Final Drill Date: 1996-10-07 | |
Well Total Depth: 1641.00 m | |
Surface Hole Latitude: 52.601733 | |
Surface Hole Longitude: -113.346675 |
Date | Event |
---|---|
1996-09-25 | Obtained License |
1996-10-01 | Lost Circulation Occurred |
1996-10-02 | Surface Casing Operation Performed |
1996-10-07 | Finished Drilling |
1996-10-07 | Well Log Performed |
1996-10-07 | Well Mode changed to Drilled and Cased |
1996-10-09 | Production Casing Operation Performed |
1996-10-09 | Rig Released |
1996-10-28 | Perforation Treatment Performed - Jet Perforation |
1996-11-07 | Perforation Treatment Performed - Fractured |
1996-11-09 | Perforation Treatment Performed - Fractured |
1996-11-23 | Perforation Treatment Performed - Jet Perforation |
1996-11-25 | Perforation Treatment Performed - Fractured |
1997-09-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-09-09 | Plug Back Performed |
1997-09-10 | Perforation Treatment Performed - Jet Perforation |
1997-09-15 | Perforation Treatment Performed - Fractured |
1997-11-18 | Perforation Treatment Performed - Fractured |
1997-11-24 | Well Began Production |
1997-11-24 | Well Fluid changed to Gas |
1997-11-24 | Well Mode changed to Flowing |
2003-11-25 | Perforation Treatment Performed - Jet Perforation |
2003-11-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-11-26 | Perforation Treatment Performed - Jet Perforation |
2003-11-26 | Perforation Treatment Performed - Remedial Casing |
2003-11-26 | Well Log Performed |
2003-11-27 | Perforation Treatment Performed - Jet Perforation |
2003-11-27 | Perforation Treatment Performed - Remedial Casing |
2003-11-27 | Well Log Performed |
2003-12-03 | Well Log Performed |
2004-01-14 | Well Fluid changed to Gas |
2004-01-14 | Well Mode changed to Suspended |
2015-11-13 | Perforation Treatment Performed - Jet Perforation |
2015-11-13 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-10-28 | Perforation | 1536.50 | 1537.50 | 18 |
1997-09-15 | Fracture | 801.00 | 806.00 | 0 |
1997-11-18 | Fracture | 801.00 | 806.00 | 0 |
2003-11-25 | Perforation | 510.00 | 511.00 | 13 |
2003-11-26 | Acid Treatment | 510.00 | 511.00 | 0 |
2003-11-26 | Remedial Casing Cementing | 510.00 | 511.00 | 0 |
2003-11-26 | Perforation | 230.00 | 231.00 | 13 |
2003-11-27 | Perforation | 345.00 | 346.00 | 13 |
2003-11-27 | Perforation | 460.00 | 461.00 | 13 |
2003-11-27 | Remedial Casing Cementing | 230.00 | 461.00 | 0 |
2015-11-13 | Perforation | 564.00 | 565.00 | 13 |
1996-11-07 | Fracture | 1536.50 | 1537.50 | 0 |
2015-11-13 | Perforation | 568.50 | 570.00 | 13 |
1996-11-09 | Fracture | 1536.50 | 1537.50 | 0 |
1996-11-23 | Perforation | 1509.50 | 1510.50 | 18 |
1996-11-25 | Fracture | 1509.50 | 1510.50 | 0 |
1997-09-09 | Packing Device Capped w/Cement | 1527.00 | 1535.00 | 0 |
1997-09-09 | Packing Device Capped w/Cement | 1499.00 | 1507.00 | 0 |
1997-09-10 | Perforation | 801.00 | 803.00 | 18 |
1997-09-10 | Perforation | 804.50 | 806.00 | 18 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 887 | 0.0 | 0.0 | 0.0 |
1998 | 6877 | 0.0 | 0.0 | 0.0 |
2000 | 6375 | 0.0 | 0.0 | 0.0 |
2001 | 8355 | 0.0 | 0.0 | 0.0 |
2002 | 8270 | 0.0 | 0.0 | 0.0 |
2003 | 7985 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1996-10-01 | Lost Circulation | 60.00 | 70.00 |
2015-11-13 | No Incident Encountered | 0.00 | 0.00 |
2015-11-23 | No Incident Encountered | 0.00 | 0.00 |
2018-11-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]