X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424242201000

Well Details

Well ID: 0424242201000
Loading map...
Location: 00/01-22-042-24W4/0
Location Alias: 00/01-22-42-24 W4M
Location Alias 2: 00/01-22-042-24 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 24
Section: 22
County/Municipality: Ponoka County
Well Name: EMBER CHIGWL N 1-22-42-24
Operator Name: Ember Resources Inc.
License Number: 0325580
License Date: 2005-02-04
License Status: Issued
Spud Date: 2005-02-28
Final Drill Date: 2005-03-01
Well Total Depth: 554.00 m
Surface Hole Latitude: 52.626077
Surface Hole Longitude: -113.369177

For data sources see[1][2]

Well History

Date Event
2005-02-04 Obtained License
2005-02-28 Surface Casing Operation Performed
2005-03-01 Finished Drilling
2005-03-01 Production Casing Operation Performed
2005-03-01 Well Log Performed
2005-03-01 Well Mode changed to Drilled and Cased
2005-03-02 Rig Released
2005-03-22 Well Log Performed
2005-05-31 Perforation Treatment Performed - Jet Perforation
2005-05-31 Well Log Performed
2005-06-16 Perforation Treatment Performed - Fractured
2006-12-07 Well Began Production
2006-12-07 Well Fluid changed to Gas
2006-12-07 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-05-31 Perforation 523.00 524.00 13
2005-05-31 Perforation 400.50 401.50 13
2005-05-31 Perforation 379.00 380.00 13
2005-05-31 Perforation 342.00 343.00 13
2005-05-31 Perforation 328.50 329.50 13
2005-05-31 Perforation 316.00 317.00 13
2005-05-31 Perforation 295.00 296.00 13
2005-05-31 Perforation 286.50 287.50 13
2005-05-31 Perforation 273.00 274.00 13
2005-06-16 Fracture 523.00 524.00 0
2005-06-16 Fracture 509.00 510.00 0
2005-05-31 Perforation 509.00 510.00 13
2005-06-16 Fracture 502.00 504.00 0
2005-06-16 Fracture 489.00 490.00 0
2005-06-16 Fracture 479.00 481.00 0
2005-06-16 Fracture 470.50 471.50 0
2005-06-16 Fracture 461.00 463.00 0
2005-06-16 Fracture 452.00 453.00 0
2005-06-16 Fracture 406.50 407.50 0
2005-06-16 Fracture 400.50 401.50 0
2005-06-16 Fracture 379.00 380.00 0
2005-06-16 Fracture 342.00 343.00 0
2005-05-31 Perforation 502.00 504.00 13
2005-06-16 Fracture 328.50 329.50 0
2005-06-16 Fracture 316.00 317.00 0
2005-06-16 Fracture 295.00 296.00 0
2005-06-16 Fracture 286.50 287.50 0
2005-06-16 Fracture 273.00 274.00 0
2005-05-31 Perforation 489.00 490.00 13
2005-05-31 Perforation 479.00 481.00 13
2005-05-31 Perforation 470.50 471.50 13
2005-05-31 Perforation 461.00 463.00 13
2005-05-31 Perforation 452.00 453.00 13
2005-05-31 Perforation 406.50 407.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 576 0.0 0.0 0.0
2007 8754 0.0 0.0 0.0
2008 8777 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8704 0.0 0.0 0.0
2011 8653 0.0 0.0 0.0
2012 8714 0.0 0.0 0.0
2013 8752 0.0 0.0 0.0
2014 8736 0.0 0.0 0.0
2015 8749 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8670 0.0 0.0 0.0
2018 2845 0.0 0.0 0.0
2019 2156 0.0 0.0 0.0
2020 503 0.0 0.0 0.0

For data sources see[5]

References