X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424251106000

Well Details

Well ID: 0424251106000
Loading map...
Location: 00/06-11-042-25W4/0
Location Alias: 00/06-11-42-25 W4M
Location Alias 2: 00/06-11-042-25 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 25
Section: 11
County/Municipality: Ponoka County
Well Name: CPC RESOURCES CHIGWELL 6-11-42-25
Operator Name: Lynx Energy ULC
License Number: 0360445
License Date: 2006-07-20
License Status: Issued
Spud Date: 2006-08-21
Final Drill Date: 2006-08-22
Well Total Depth: 900.00 m
Surface Hole Latitude: 52.600883
Surface Hole Longitude: -113.496133

For data sources see[1][2]

Well History

Date Event
2006-07-20 Obtained License
2006-08-22 Finished Drilling
2006-08-22 Production Casing Operation Performed
2006-08-22 Rig Released
2006-08-22 Surface Casing Operation Performed
2006-08-22 Well Mode changed to Drilled and Cased
2006-08-31 Well Log Performed
2006-09-09 Perforation Treatment Performed - Jet Perforation
2006-11-11 Perforation Treatment Performed - Fractured
2006-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-21 Plug Back Performed
2006-11-21 Well Mode changed to Abandoned Zone
2006-11-23 Perforation Treatment Performed - Jet Perforation
2006-11-30 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-09-09 Perforation 832.00 833.00 20
2006-11-23 Perforation 532.60 533.60 7
2006-11-23 Perforation 528.40 529.40 7
2006-11-23 Perforation 522.50 523.50 7
2006-11-23 Perforation 508.20 509.20 7
2006-11-23 Perforation 506.00 507.00 7
2006-11-23 Perforation 500.40 501.40 7
2006-11-23 Perforation 497.30 498.30 7
2006-11-23 Perforation 485.70 488.70 7
2006-11-23 Perforation 474.90 475.90 7
2006-11-23 Perforation 440.40 441.40 7
2006-11-11 Fracture 832.00 833.00 0
2006-11-23 Perforation 432.20 433.20 7
2006-11-23 Perforation 425.30 426.30 7
2006-11-23 Perforation 414.80 415.80 7
2006-11-23 Perforation 413.10 414.10 7
2006-11-23 Perforation 409.90 411.40 7
2006-11-23 Perforation 374.80 375.80 7
2006-11-23 Perforation 349.90 350.90 7
2006-11-23 Perforation 317.10 318.10 7
2006-11-23 Perforation 314.60 315.60 7
2006-11-23 Perforation 311.10 312.10 7
2006-11-21 Packing Device Capped w/Cement 822.00 830.00 0
2006-11-23 Perforation 295.20 296.20 7
2006-11-30 Fracture 295.20 588.20 0
2006-11-23 Perforation 587.20 588.20 7
2006-11-23 Perforation 556.50 557.50 7
2006-11-23 Perforation 549.80 550.80 7
2006-11-23 Perforation 543.10 544.10 7
2006-11-23 Perforation 536.70 537.70 7
2006-11-23 Perforation 534.30 535.30 7

For data sources see[4]



References