If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424252011020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.632765,"lon":-113.568973,"icon":""}]} |
Location: 02/11-20-042-25W4/0 | |
Location Alias: 02/11-20-42-25 W4M | |
Location Alias 2: 02/11-20-042-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 25 | |
Section: 20 | |
County/Municipality: Ponoka County | |
Well Name: EMBER CHIGWELL 11-20-42-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0326497 | |
License Date: 2005-02-16 | |
License Status: Suspension | |
Spud Date: 2005-03-02 | |
Final Drill Date: 2005-03-03 | |
Well Total Depth: 550.00 m | |
Surface Hole Latitude: 52.632765 | |
Surface Hole Longitude: -113.568973 |
Date | Event |
---|---|
2005-02-16 | Obtained License |
2005-03-02 | Surface Casing Operation Performed |
2005-03-03 | Finished Drilling |
2005-03-03 | Production Casing Operation Performed |
2005-03-03 | Well Log Performed |
2005-03-03 | Well Mode changed to Drilled and Cased |
2005-03-04 | Rig Released |
2005-03-23 | Well Log Performed |
2005-04-08 | Well Log Performed |
2005-05-31 | Perforation Treatment Performed - Jet Perforation |
2005-06-14 | Perforation Treatment Performed - Fractured |
2005-06-19 | Well Began Production |
2005-06-19 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-06-19 | Well Mode changed to Flowing |
2019-02-01 | Well Fluid changed to Coalbed Methane-Coals Only |
2019-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-05-31 | Perforation | 521.00 | 522.00 | 13 |
2005-05-31 | Perforation | 453.50 | 455.00 | 13 |
2005-05-31 | Perforation | 451.00 | 452.00 | 13 |
2005-05-31 | Perforation | 445.50 | 446.50 | 13 |
2005-05-31 | Perforation | 443.00 | 444.00 | 13 |
2005-05-31 | Perforation | 406.00 | 407.00 | 13 |
2005-05-31 | Perforation | 397.50 | 398.50 | 13 |
2005-05-31 | Perforation | 384.00 | 385.00 | 13 |
2005-05-31 | Perforation | 381.00 | 382.00 | 13 |
2005-05-31 | Perforation | 378.00 | 379.00 | 13 |
2005-05-31 | Perforation | 339.00 | 340.00 | 13 |
2005-05-31 | Perforation | 508.00 | 509.00 | 13 |
2005-05-31 | Perforation | 321.00 | 322.00 | 13 |
2005-06-14 | Fracture | 521.00 | 522.00 | 0 |
2005-06-14 | Fracture | 508.00 | 509.00 | 0 |
2005-06-14 | Fracture | 500.00 | 505.00 | 0 |
2005-06-14 | Fracture | 493.50 | 495.00 | 0 |
2005-06-14 | Fracture | 488.00 | 490.00 | 0 |
2005-06-14 | Fracture | 480.00 | 481.00 | 0 |
2005-06-14 | Fracture | 474.00 | 475.00 | 0 |
2005-06-14 | Fracture | 469.00 | 471.00 | 0 |
2005-06-14 | Fracture | 451.00 | 455.00 | 0 |
2005-05-31 | Perforation | 504.00 | 505.00 | 13 |
2005-06-14 | Fracture | 443.00 | 446.50 | 0 |
2005-06-14 | Fracture | 406.00 | 407.00 | 0 |
2005-06-14 | Fracture | 397.50 | 398.50 | 0 |
2005-06-14 | Fracture | 384.00 | 385.00 | 0 |
2005-06-14 | Fracture | 378.00 | 382.00 | 0 |
2005-06-14 | Fracture | 339.00 | 340.00 | 0 |
2005-06-14 | Fracture | 321.00 | 322.00 | 0 |
2005-05-31 | Perforation | 500.00 | 503.00 | 13 |
2005-05-31 | Perforation | 493.50 | 495.00 | 13 |
2005-05-31 | Perforation | 488.00 | 490.00 | 13 |
2005-05-31 | Perforation | 480.00 | 481.00 | 13 |
2005-05-31 | Perforation | 474.00 | 475.00 | 13 |
2005-05-31 | Perforation | 469.00 | 471.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 4206 | 0.0 | 0.0 | 0.0 |
2006 | 8486 | 0.0 | 0.0 | 0.0 |
2007 | 7537 | 0.0 | 0.0 | 0.0 |
2008 | 8461 | 0.0 | 0.0 | 0.0 |
2009 | 8404 | 0.0 | 0.0 | 0.0 |
2010 | 8673 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8625 | 0.0 | 0.0 | 0.0 |
2016 | 8621 | 0.0 | 0.0 | 0.0 |
2017 | 1260 | 0.0 | 0.0 | 0.0 |
For data sources see[5]